说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 750m~3高炉
1.
Project Management Model of No.3 BF at Laigang;
莱钢3~#750m~3高炉工程管理模式
2.
Optimization of Thailand 750m~3 Blast Furnace the Equipments Installation & Construction;
泰国750m~3高炉设备安装与施工的优化
3.
Research and Establishment of the Mathematic Model of Laiwu Steel's 750 m~3 BF Coal Injection
莱钢750m~3高炉喷煤数学模型的研究与建立
4.
Smelting Practice of High Yield and Low Consumption in Jinan Steel’s No.3 1 750 m~3 BF
济钢3~#1750m~3高炉高产低耗冶炼实践
5.
Modification and optimization of the nozzle-tapping machine for the 1750 blast furnace at Jinan Iron and Steel Co.
济钢1750m~3高炉炉前开口机的优化改造
6.
Practice of Feeding Ti-wire for Protecting Hearth in 1750 m~3 BF in Jinan Steel
济钢2~#1750m~3高炉喂线护炉实践
7.
The Research and Application of Integrative Control System on 750m~3 Blast Furnace;
750m~3高炉综合自动化控制系统的研究与应用
8.
OPTIMIZATION DESIGN OF RIGID FRAMES FOR THE SHAFT AND TOP OF A 3 200 m~3 BLAST FURNACE IN LIAN STEEL COMPANY
涟钢3200m~3高炉炉身、炉顶刚架优化设计
9.
Maintenance Practice at the Later Stage of Campaign of Masteel's 2500~3 BF
马钢2500m~3高炉炉役后期护炉实践
10.
Control techniques for bell-less top in the new No. 3 BF of WISCO
武钢新3号高炉无料钟炉顶控制技术
11.
Automatic control system for hot stoves of No.3 BF in Shanghai Meishan Metallurgical Co
梅山3~#高炉热风炉自动控制系统
12.
Xinsteel 1300 m~3 BF Cracking Skin Cause Analysis
新钢1300m~3高炉炉皮频繁开裂原因分析
13.
Production Practice of BF Temperature in 4350m~3 BF at TISCO
太钢4350m~3高炉稳定炉温的生产实践
14.
Blowing-in and Production of No.1 Blast Furnace in BXsteel
本钢新1号4747m~3高炉开炉达产实践
15.
Practice on Arrival at No.3 Blast Furnace Full Capacity with Medium Maintenance and Blow-in of Baotou Steel
包钢3~#高炉中修开炉快速达产实践
16.
Technical Process Features of 5800 m~3 Blast Furnace Stack in Shagang
沙钢5800m~3高炉炉体工艺技术特点
17.
FEATURES ANALYSIS OF INTERNAL-COMBUSTION HOT BLAST STOVE FOR 3200 m3 BLAST FURNACE
唐钢3200m~3高炉内燃式热风炉特点分析
18.
Technological Practice on Operation in front of Blast Furnace in Xilin Iron & Steel Group Co.,Ltd.
450m~3高炉炉前操作技术实践