1.
Many designers and operators require such paint on their secondary reformer shells.
有些设计者和操作者需要在二段转化炉外壳涂以此种油漆。
2.
Analyzing Waste Heat Utilization of Flue Gas in Convection Section of Primary Reformer
一段转化炉对流段烟气余热利用分析
3.
Since the ammonium nitrate plant put into operation, whole production line shuts down many times due to the fault of the waste heat boiler.
黑化硝铵厂合成氨系统投产二十年以来,由于转化二段炉出口废热锅炉故障造成多次系统全线停车。
4.
Reformer is the key equipment in the hydrocarbon steam process while radiation reformer tube is the core of the total.
转化炉是烃类蒸汽转化工艺过程的关键设备,而转化炉的辐射段转化管更为关键的核心。
5.
Application of two-step coal gasification technology in hydrogen fluoride reaction converter and powder baker
两段式煤气化技术在氟化氢反应转炉和烘粉炉上的应用
6.
The Research of Residual Lifetime Estimation of (101B) Hydrogen Reformer Tubes;
大型合成氨装置一段转化炉(101B)炉管的剩余寿命预测研究
7.
The First Heat of Converter Steelmaking after Fettling's Dephophorization Analysis and Optimize
转炉补炉第一炉脱磷分析及工艺优化
8.
The Design of System of Suck-Wind Machine s Frequency-conversion and Timing in Synthesis Ammonia Section Transform Furnace;
合成氨装置一段转化炉引风机变频调速系统设计
9.
Small-scale Ethylene Cracking Furnace Tube Radiation Paragraph Domestic Reform
小乙烯裂解炉辐射段炉管国产化改造
10.
Investigation on Modification of the Heat-exchanged Oxygen Two-stag Reformer in Methanol Production
甲醇装置换热式纯氧二段转化工艺技改探讨
11.
Thermal Engineering Analysis for the Techno-Interface of BF-BOF Region;
高炉—转炉区段工艺技术界面热能工程分析
12.
Construction Method of Subsection Installing for 120 Ton Converter Installation
一钢轧总厂120 t转炉炉体分段安装施工工艺
13.
Technology of waste incineration and two stage reciprocating grate
垃圾焚烧二段式往复炉排的工艺技术
14.
Adjustment on combustion of the municipal refuse incinerator
SLP250二段式垃圾焚烧炉的燃烧调整
15.
band switching diode
波段转换开关二极管
16.
Optimum Study of Slag Splashing Technology to 50t Converters at Jiusteel;
酒钢50t转炉溅渣炉技术优化实验研究
17.
Occasionally enriched air or supple mental oxygen is available and a greater ratio of secondary reforming to primary reforming is possible.
偶尔有富氧空气或补充氧的,因而二段转化对一段转化的大比例是可能的。
18.
Practice on lining protection of the Top and Bottom Combined Blown Converter in the No.2 Steelmaking Plant of Angang
鞍钢二炼钢顶底复吹转炉护炉工艺实践