1.
The Application of Chemical Grout in the Shaft Face Pregrouting
化学浆液在井筒工作面预注浆施工中的应用
2.
Lab Mixing Ratio Test of Drilling Mud Flushing Liquid for Surface Ground Pre-Grouting
地面预注浆用泥浆冲洗液的室内配比试验
3.
Vertical Shaft Aquifer Surface Advance Grouting Engineering Technique
立井井筒含水层地面预注浆施工技术
4.
Sealing construction technique of pre-grouting working face in Baiyun tunnel
白云隧道工作面预注浆止水施工技术
5.
Lawer Third System Red Bed Grouting in Air Shaft Ground Pregrouting in Yangcun Coal Mine
杨村煤矿风井地面预注浆工程的下第三系红层注浆
6.
Construction Technology and Experience of Pre-grouting on the Stepping Shaft Face
措施竖井工作面预注浆施工技术及经验
7.
The Application of the Surface Pre-grouting in the Raise-boring Well Brush Shaft Construction
地面预注浆在反井刷大建井工艺中的应用
8.
The surface Pre-grouting Method of Shicao Coal Mine Vice-shaft
石槽村煤矿副井井筒地面预注浆施工方法
9.
Optimization of Construction Design for Surface Pre-grouting Project of Mine Shaft in Yangcun Mine
杨村煤矿立井地面预注浆工程设计优化
10.
Accident Treatment of Boring in Air Shaft Ground Pre-grouting in Yangcun Coal Nine
杨村煤矿风井地面预注浆工程钻孔内事故处理
11.
Calculation Method of Surface Pre-grouting Result Inspection and Measurement for Mine Shaft Sinking
立井井筒地面预注浆效果检测的计算方法
12.
A study on the pre-grouting in deep mine for water blockage in Longgu Coal Mine
龙固矿深立井大流量工作面预注浆堵水研究
13.
Research and Application of Face Beforehand Grouting Intercept Water Technology in Shaft
立井井筒工作面预注浆堵水技术的研究与应用
14.
Pre-grouting Technology at Surface for 100 m Thick High Weathered Rock Zone in Ventilation Shaft of Yangcun Mine
杨村煤矿百米厚强风化带风井地面预注浆技术
15.
Stability Analysis of the Unfavorable Geologic Section with Pre-grouting Reinforcement in Subsea Tunnel at Jiaozhou Bay
胶州湾海底隧道预注浆加固不良地质段的稳定性分析
16.
Pregrouting in K2 Calcareous Rock Water-Bearing Stratum of Gan he Coal Mine Slanting Lane
干河煤矿清理斜巷K2灰岩高压含水层预注浆施工技术
17.
Pre-Grouting Behind Lining for Boring a Cross Passage of Shanghai Subway
上海地铁旁通道冻结法施工壁后预注浆施工技术
18.
Pre-strengthening technology by grouting through surface into broken rock zone around shallow tunnel
隧道浅埋破碎带地表注浆预加固技术