说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 张峰水库
1.
Construction of Prestressed Anchorage Cable on Sluice Chamber of Zhangfeng Reservoir’s Spillway
张峰水库溢洪道闸室预应力锚索施工
2.
Evaluation on the Engineering Geologic Conditions of the Flood Spillway of Zhangfeng Reservoir
张峰水库溢洪道工程地质条件及评价
3.
Analysis on Stability of Shangbohou Slide in Submerged Region of Zhangfeng Reservoir
张峰水库库区上伯候滑坡稳定分析及评价
4.
Talking about the Construction Techniques for PCCP Pipeline in the Trunk Water DeliveryⅤ Bid-section of Zhangfeng Reservoir
张峰水库总干输水Ⅴ标PCCP管道施工技术
5.
The Comparison and Focal Points of the Design Plans of Water Supply Power Tunnel of Zhangfeng Reservoir
张峰水库供水发电洞方案比选与设计要点
6.
On the Lightning Protection and Grounding Design for Chuanpo Hydropower Station of Zhangfeng Reservoir
浅析张峰水库川坡水电站防雷保护与接地设计
7.
Construction and Application of Automatic Water Regime Survey-report System of Zhangfeng Reservoir
张峰水库水情自动测报系统建设与应用
8.
Probe into Reclamation Techniques of Clay Sloping Core Roch-fill Dam of Zhangfeng Reseroir
张峰水库粘土斜心墙堆石坝填筑施工工艺探讨
9.
On the Movement and Arrangement of the First Stage Immigrant of Zhangfeng Reservoir;
张峰水库一期移民搬迁安置的实践与思考
10.
Productive Test to Treat Cracks in Original Grouting Gallery under the Dam of Zhangfeng Reservoir
张峰水库大坝原灌浆廊道裂缝处理生产性试验
11.
Talking about the Treatment of the Cracks on the Concrete Liner of the Power Tunnel of Zhangfeng Reservoir
张峰水库发电洞衬砌混凝土裂缝处理浅谈
12.
Analysis on the Water-cost Bearing Capacity and the Estimation of the Loaning Ability for the Project of the Zhangfeng Reservoir;
张峰水库项目水价承受能力分析及贷款能力测算
13.
Application of Computer Monitoring and Control System of Zhangfeng Reservoir’s Headwork Hydroeleciric Station,Pumping Station and Chuanpo Hydroelectric Station
张峰水库渠首电站及泵站和川坡水电站计算机监控系统应用
14.
Evaluation on the Engineering Geological Conditions of Dongshan Siphon of the Main Section of the Water Conveyance Project of Zhanngfeng Reservoir
张峰水库输水工程总干东山倒虹工程地质条件及评价
15.
On Manufacture and Installation of Buried Steel Pipe in Water-supply & Power Tunnel and Open Steel Pipe into Power Station in Zhangfeng Reservoir
张峰水库供水发电洞洞内埋管及电站厂房明管制安施工
16.
Talking about the Concrete Quality Control of Canal Head Power Station and Canal Head Pump Station of Zhangfeng Reservoir Project
浅述张峰水库工程渠首电站和渠首泵站的混凝土质量控制
17.
Realization of Automatic Operation System's Optical Communication Network of Zhangfeng Reservoir
张峰水库枢纽调度自动化系统光通信网络的实现
18.
Study on Process or Volume Control in Reservoir Operation and Forecasted Flood Operation Rule for Biliuhe Reservoir;
水库洪水调度峰量控制类型与碧流河水库防洪预报调度规则研究