1.
Research on New Process for Ore Fragmentation in Jade Mine by Energy-Concentrated Control Blast
聚能控制爆破开采玉石矿床落矿新工艺研究
2.
The mechanic affection on the blast hole walls is simply analysed and cracking propagation caused by shaped charge is explained in this paper.
简单分析了聚能爆破装药在孔内爆破的力学效应,阐明了聚能爆破对岩石定向破裂的控制机理。
3.
Application of Binding Energy Tube Directional Blasting Technique for Fracture Control in Rock Driving
聚能管定向断裂控制爆破技术在岩巷掘进中的应用
4.
Comparison between smooth blasting and multidimensional cumulative cutting blasting
光面爆破与多面聚能切割爆破的比较
5.
Control of explosion in reconstruction of energy dissipation structures of Hongshi dam
红石大坝泄洪消能工改造工程爆破施工控制
6.
Demolition of 210 m Reinforced Concrete Chimney of Chengdu Huaneng Plant by Controlled Blasting
成都华能电厂210m钢筋砼烟囱控制爆破拆除
7.
On the Study of Blasting Vibration Mechanism and the Control of Blasting Vibration Effects;
爆破震动机理及爆破震动效应控制的研究
8.
The Application of Presplit Controlled Blasting Technique in the Hard Rock Blast
预裂控制爆破技术在坚硬岩石爆破中的应用
9.
Research on splitting technical of coal bed deep-hole cumulative blasting to improve permeability
煤层深孔聚能爆破致裂增透工艺研究
10.
Design and Construction of Non-electric Relay Network in Deep-hole Controlled Blasting at Zhubaoshan
珠包山深孔控制爆破起爆网路设计与施工
11.
THE SUCCESSFUL APPLICATION OF CONTROLLING BLASTING TECHNIQUE IN SHENBU COPPER MINE
控制爆破技术在深部铜矿的成功应用
12.
Middle and Deep Hole Controlled Blasting of Rock Cut in the Complicated Surroundings;
复杂环境下路堑土岩中深孔控制爆破
13.
Analysis and Control of the Risk of Cost Estimation in the Blasting Engineering;
爆破工程成本估算风险性分析与控制
14.
The design of blasting control of the hard rock in large cross-section undersea tunnel
超大断面海底隧道硬岩控制爆破设计
15.
PRACTICE IN CONTROLLED BLAST REMOVAL OF THE SHANGPAI RIVER BRIDGE
上派河大桥控制爆破拆除的施工实践
16.
Rotary drilling machine replacing downhole drill to accomplish controllable blasting of slope
牙轮钻取代边坡钻完成边帮控制爆破
17.
Discussion About the Problem of Shearing Point Forward Shiftting During Demolition by Controlled Blasting
控制爆破拆除中转铰点前移问题探讨
18.
Security Analysis of 180m High Reinforced Concrete Chimney by Controlled Blasting
180m钢筋混凝土烟囱控制爆破安全分析