1.
Abstract: This paper introduces the improving process of hoist oil system and circuit system.
文摘:介绍了煤矿提升绞车电路系统和油路系统的改造过程。
2.
Technical Innovation of the Dynamical Braking of JKD-2.5miles Type Special Winding Used at Coal Mine;
煤矿专用提升绞车JKD—2.5M动力制动的技术改造
3.
Safty brake time for the idle stroke of mine hoist and winch
矿用提升机和提升绞车之安全制动空行程时间测试方法探究
4.
sinking hoisting plant
向下掘进用提升绞车
5.
Discussion on the Safety Check and Concrete Implementation of Hoisting of Coal Cutter and Holder with Slow-Motion Winch
慢速绞车提升采煤机和支架的安全校验及具体实施
6.
The miners are lowered into the mine by means of an elevator known as a cage. In the same shaft there is often a hoist, a bucketlike elevator used to raise mined ore from lower levels.
矿工借助于叫作罐笼的升降机下井。井筒里通常还安装有绞车,一种用来提升矿石的斗式升降机。
7.
This paper introduces the improving process of overwind and automatic speed reducting gear for mine hoist.
介绍了矿用提升绞车过卷及自动减速装置改进的过程。
8.
Reformed Design of Mine Winch Electric Control System Based on PLC Variable-frequency
煤矿绞车电控系统的PLC变频改造设计
9.
Application and Maintenance of Frequency Speed-regulating Systems in Coal Mines
煤矿井下交流变频绞车的应用与维护
10.
Reformation of Shaft Winch Low-frequency Control System in Xinxing Coal Mine
新兴煤矿立井绞车低频控制系统改造
11.
Yangzhuang Coal Mine New Vice-well Winch Main Axle Installs Transformation
杨庄煤矿新副井绞车主轴装置的改造
12.
Variable Frequency Technology Rebuilding of 1# Subsidiary Shaft Wench in Xie Zhuang Coal Mine
协庄煤矿1#副井绞车变频技术改造
13.
JD-55 Hydraulic Winch Systems to Enhance Multi-level Transformation
JD-55绞车多级提升液压系统的改造
14.
Method of Determining Cental Line and Axis Line of Inclined Well Winch of Coal Mine
煤矿大斜井绞车增型中心线及轴线给定方法
15.
Abstract: The method of detecting hoist two-class brake is introduced.
文摘:介绍了测试大型提升绞车二级制动的方法。
16.
Application of Numbered Governor Electric Control in Main Hoisting
全数字串级调速电控在主提升绞车中的应用
17.
Explosion-proof Hoist Hydraulic Design of Condition Monitoring System
防爆液压提升绞车状态监测系统设计研究
18.
Terms relating to coal mining--Hoisting and transport
GB/T15663.5-1995煤矿科技术语提升运输