1.
Using the means of testing at site, calculating the load factor, power factor, and finding the economical work character.
通过现场测试,进行经济负载率的计算,确定负载率,功率因数,找出电动机的工作特性。
2.
Test procedure on working site for measuring the loading percentage of a three phase induction motor
GB/T8916-1988三相异步电动机负载率现场测试方法
3.
The Planning of Substation and Switch Station for Distribution Network Based on Load Ratio
基于负载率的配电网变电站与开闭所规划
4.
x ray output at full ratings
x射线满负载输出功率
5.
under frequency load shedding
低频率自动负载减少
6.
testing methods for crimp of yarn in fabrics : dead load
纤维纱卷曲率测定法:完全负载法
7.
Time switch for tariff and load contro
GB/T9092-1998费率和负载控制时间开关
8.
testing method for crimp in yarns from fabrics : load-elongation method
纤维纱卷曲率测定法:负载-伸长法
9.
Select the load power type from the drop-down list.
从下拉列表中选择负载功率类型。
10.
Design and Realization of Energy Feedback Type Electronic Power Load;
电能反馈式电子模拟功率负载的研制
11.
The optimal load concerning the power amplifier and the transducer
换能器与功率放大器的最佳负载讨论
12.
Design on The Loads and The Structure of The Microwave Power Calorimeter
微波功率量热计负载及整体结构设计
13.
Research of Doherty Power Amplifier with a Modified Load Network
一种改进Doherty功率放大器负载网络研究
14.
Application of Inverter in Speed Adjustment for Square Law Loads
变频器在二次方率负载调速中的运用
15.
High Power Low Inductance Dummy Load Made of Metal Film Resistors
基于金属膜电阻的大功率低电感负载
16.
Stability analysis of synchronous generators with constant power loads
同步发电机带恒功率负载稳定性分析
17.
testing methods of thickness loss under dynamic loading for textile floor coverings
纺织材料覆地物的动态负载厚度减少率测定法
18.
The occupation rate of hotels reached or even surpassed 100 percent, and railways and civil aviation operated with overload.
饭店入住率超过100%,铁路、民航超负荷运载。