说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 综采工作面收尾
1.
A New Technology of Roof Supporting in End-mining of Full-mechanized Mining Face
综采工作面收尾施工中顶板支护的一种新技术
2.
Research on fully mechanized mining face ending removing space roof supporting form
综采工作面收尾撤架空间顶板支护方式探讨
3.
Study on the Stability of the Soft-Rock Tail-Gate for the Fully-Mechanized Working Face Based on Mining Stress Effect;
基于采动应力作用的综采工作面软岩尾巷稳定性研究
4.
Mining all Height at One Time Technology of Large Mining High Angle Compound Mining Working Face
大采高大倾角综采工作面一次采全高回采工艺
5.
Research and Application of New Technology of Safe Withdrawing and Fast Installation at Fully Mechanized Face
综采工作面安全回收和快速安装新工艺的研究与应用
6.
Research on the Method of Draining the Gas on Roof Gallery of Full-Mechanized Caving Mining Face
综放工作面尾巷排放瓦斯方式的探讨
7.
Research on Movement Characteristic of Surrounding Rock in Full-mechanized Mining Face with Large Mining Height
大采高综采工作面围岩活动特征研究
8.
Full-mechanized Mining Technology under Complex Geological Condition
复杂地质条件下综采工作面回采技术
9.
Highly gassy longwall coal faces with big mining heights:comprehensive mine gas control technology
大采高高瓦斯综采工作面瓦斯综合治理技术
10.
Comprehensive Gas Drainage Technology of Fully Mechanized Mining Face in Seam with Soft Roof,Soft Coal and Soft Floor
三软厚煤层综采工作面瓦斯综合抽采技术
11.
Longwall face all cross-sectional bolt-wire mesh:fast dismantling technology
综采工作面全断面锚网快速拆除技术
12.
Technique Practice of Transportation Side Tunnel Size of Large and Small Comprehensive Faces Linking;
综采工作面运输巷侧大小工作面对接工艺
13.
Surrounding Rock Control Study of the Coal Entry with Greater Mining-Height;
大采高综采工作面回采巷道围岩控制技术研究
14.
Study on the Gas Migration in the Goaf Filling of Full-mechanized Mining Working Face
综采工作面充填开采采空区瓦斯运移研究
15.
The Applied Research of Gas Drainage Technology in the Goaf of Full-Mechanized Mining Working Face
综采工作面采空区瓦斯抽采技术的应用研究
16.
Technology of30kt/d Full-mechanized Mining with Large Mining Height in Large Angle Coal seam
日产30kt大采高大倾角综采工作面开采技术
17.
Grouting Reinforcement Construction Techniques on 68302 Fully Mechanized Face
68302综采工作面注浆加固施工方法
18.
Increasing Rate of Coal Mining with Improving Coal Caving Technology at Fully Mechanized Face
改进综放工作面放煤工艺提高回采率