1.
The Research of Operating Characteristic for 1000MW Ultra-supercritical Units
1000MW超超临界机组运行特性研究
2.
Study on the Characteristics of Start-up of the 600MW Ultra-supercritical Generating Unit
600MW超超临界机组启动特性研究
3.
Hoisting and Installation of Top Girder in 1000 MW Super-critical Unit Boiler
1000MW超超临界机组锅炉顶板梁吊装
4.
Emergency Protection System of USC Steam Turbines
1000MW超超临界机组保护系统简介
5.
Design of Superheated Steam Temperature Control in 1000MW Super-supercritical Unit
1000MW超超临界机组过热汽温控制设计
6.
1000 MW USC Unit Bearing Bush Vibration Analysis and Remedy
1000MW超超临界机组瓦振动分析及处理
7.
Analysis on Configuration Mode without Motor-Driven Feed Pump for 1000MW Ultra-Supercritical Unit
1000MW超超临界机组无电泵配置方式分析
8.
Discussion on Main Building Layout of 1000MW Ultra Super Critical Unit
1000MW超超临界机组主厂房布置格局探讨
9.
Investigation on Selection of 1000 MW ESC Unit Ash Handling System
1000MW超超临界机组除渣系统的选择
10.
Design analysis of the Selection of the Four main pipelines of the 1000MW Ultra Supercritical Unit
1000MW超超临界机组四大管道的选材
11.
Design Optimization for 1000MW Ultra-supercritical Unit Control System
1000MW超超临界机组控制系统设计优化
12.
Designing of Coordinated Control System for 600 MW Supercritical Units
600MW超超临界机组协调控制系统设计
13.
Design and Development of Simulator on 600MW Super-critical Unit;
600MW超临界机组仿真机设计与开发
14.
1000 MW USC Turbine Erection in Taizhou Power Plant
泰州电厂1000MW超超临界机组汽轮机安装探讨
15.
Analysis on Bypass Systemic Type of Ultra-supercritical Pressure Unit
超超临界机组汽轮机旁路系统选型实例分析
16.
COMPARISION OF RUN BACK STRATEGY BETWEEN SUPERCRITICAL AND SUBCRITICAL UNITS
超临界与亚临界机组RB控制策略比较
17.
Research about the Thermodynamic Parameter Matching between the Boiler and Turbine of the SC or USC Power Units
超(超)临界机组机炉参数匹配问题研究
18.
Application of T23 steel to 1 000 MW ultra-supercritical units
T23钢在超超临界1000MW机组的应用及现状