1.
The project cannot be closed while a test is running. Do you want to stop the test?
运行测试时无法关闭项目。要停止测试吗?
2.
You can now run the test and verify the functionality of the new tests.
你现在可以运行测试并确认新测试的功能。
3.
Time in seconds to run the test before tracking statistics
跟踪统计数据之前,运行测试的时间(秒)
4.
a test of one's eyesight; suBjecting a hypothesis to a test; a test of an athlete's endurance.
对某人视力进行的测试;将一假设进行测试;运动员的耐力测试
5.
A test is currently running. Stop the test or wait for its completion before executing this operation.
测试当前正在运行。执行此操作前,请停止此测试或等待此测试完成。
6.
On the other hand in Volume testing, the test execution may go on and on.
另外,在容量测试中,测试可能会不间断的运行。
7.
On Web-based Application Stress Testing with WAST;
运用WAST对Web应用程序进行压力测试
8.
Measuring partial discharge of GIS under the operating voltage
正常运行电压下GIS局部放电测试
9.
Could not collect runtime statistics from any test clients. The test will be stopped.
无法从任何测试客户端收集运行时统计数据。测试将停止。
10.
The Introduction of Compliance Test and Actual Test into On-site Banking Examination;
符合性测试与实质性测试原理在银行现场检查中的运用
11.
"In the period of Erection, Test Runs, Commissioning, Performance Test, operation, and maintenance of the Contract Plant"
在合同项目的安装、试车、投料试生产、性能测试、运行和维修期间
12.
then run ScanDisk again and choose to conduct a standard test on the drive.
然后再运行“磁盘扫描程序”,在驱动器运行标准测试。
13.
There are no performance counters available for the selected test runs.
没有性能计数器可用于选定的测试运行。
14.
After you've run your tests, ask what their coverage is.
在运行完测试后,看一下它们的覆盖率是多少。
15.
Perform a thorough test of this drive and its host.
对这个驱动器及主驱动器运行完全测试。
16.
You may encouter the error if you run the sound hardware test wizard again.
如果您再次运行声音硬件测试向导,将发生错误。
17.
Diagnosing a DS1 runs board-level hardware tests on the DS1 interface.
诊断 DS1 就是对 DS1 接口运行电路板级的硬件测试。
18.
The operational profile of the software is playing an important role in software testing.
软件运行剖面在软件测试中有着重要的作用。