1.
Study on Economic Appraisal of the Revamp of Capicity Expansion Project of Cangzhou Dahua Co.,Ltd.;
沧州大化扩能改造项目经济评价研究
2.
Capacity Expansion of a Light Ends Plant to 300kt/a;
气体分馏装置30万吨/年扩能改造
3.
The 600,000 Ton Ethylene Expansion and Reconstruction Research of Daqing Ethylene Devices;
大庆乙烯装置60万吨扩能改造的研究
4.
Technical Transform of 1.0Mt/a Delayed Coking Unit
1.0Mt/a延迟焦化装置的扩能改造设计
5.
The Engineering Design of Capacity Expansion of 4.2kt/a PET Unit
4.2万吨/年聚酯装置扩能改造工程设计
6.
Revamp for Increase in Capacity of Urea Production Unit by CO_2 Stripping
CO_2气提法尿素生产装置扩能改造
7.
Application of MDG process to tap the potential of FCCU
催化裂化装置采用MGD工艺的扩能改造
8.
MODIFICATION OF REACTION FEED FURNACE IN DIESEL HYDRO-UPGRADING UNIT
柴油加氢改质装置反应进料加热炉的扩能改造
9.
Revamping design of EO hydration reactor
环氧乙烷非催化水合反应器扩能改造设计
10.
APPLICATION OF FOUR - STAGE DISTILLATION IN THE CAPACITY EXPANSION OF ADU/ VDU
四级蒸馏在常减压装置扩能改造中的应用
11.
Investigating the Operation of Condensation after Enlarging Production of the LLDPE Reactor of QiLu Co.;
齐鲁LLDPE装置冷凝态扩能改造操作技术研究
12.
A Study on the Capacity Expansion and Innovation of the High-pressure Circle of the 750t/d Urea Plant in LTH;
泸天化750t/d尿素装置高压圈扩能改造研究
13.
The Application of Netlinx Open Network in Cobalt System Alteration;
Netlinx开放网络在钴系统扩能改造中的应用
14.
Reconstruction and Procedure Optimization of Urea Plant for Expanding the Production;
尿素装置增产扩能改造设计及工程优化
15.
Preliminary Research on Dazhou-Chengdu Railroad Reconstruction Project Applying Consignment Management;
达成铁路扩能改造工程采用代建制初步探讨
16.
Competition and Renovation of the Large Ammonia and Urea Plant;
大型化肥装置扩能改造的市场竞争力分析
17.
CCommunication Design of Train Dispatch Radio for Capacity-enlarging Renovation Project of Xi'an-Yan'an Line
西延线扩能改造工程无线列调通信设计
18.
Application of Rebar Planting Technique in Project of Aromatic Hydrocarbon Expansion Recon-struction
植筋技术在芳烃扩能改造项目中的应用