说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 唐口煤矿
1.
The tests on sample preparation units of train loading spot in Tangkou coal mine
唐口煤矿火车装车点制样机组的检验
2.
Analysis on Stability of Coal Pillar in Goaf Area of No.11 Seam in Tangshangou Mine
唐山沟煤矿11号煤层采空区煤柱稳定性分析
3.
Experiment Study of Burst Tendency of Coal and Rock Layers at Tangkou Coal Mine
唐口煤业煤岩层冲击倾向性试验研究
4.
ConstructionTechnology of Vertical Pipe Shaft forDraining Gas in TangAn Coal Mine
唐安煤矿瓦斯管道抽放竖井施工技术
5.
Research on the Technolgy of Support of Anchor Bar and Anchor Rope of the Coal Tunnel in Tangshan-gou Mine
唐山沟矿煤巷锚杆-锚索支护技术研究
6.
Comprehensive Prevention of Rock-burst in 307 Panel in Meiyukou Colliery
煤峪口矿307盘区冲击矿压综合防治
7.
The Relation of Kailuan Coal Mining Co.,Ltd.With the Development of Sanitation and Epidemic Prevention in Tangshan;
开滦煤矿与近代唐山卫生防疫事业的开展
8.
Study on the optimum production planning of Coal Washery of Tangshan Mining Branch of KaiLuan Limited Corporation
开滦集团唐山矿选煤厂最优生产计划的研究
9.
Forecast of Prospecting for Coal at Yanwukou Section in Dajiangkou Mining Area
大江口矿区岩屋口区段找煤前景预测
10.
The Reinforcement and Support Technology for the Main Entry of No.11~(-2) Coal Seam in the Coal Mine of Tang ShanGou
唐山沟煤矿11~(-2)号煤层主要大巷加固支护技术探析
11.
On impact of the Wenchuan Earthquake on Water Yield of Mine in the Tangjiahe Coal Mine
“5.12”大地震对唐家河煤矿矿井涌水影响的分析研究
12.
Geological Hosting Characteristic Research on No.2 Coal Seam,Xiayukou Coalmine
下峪口煤矿2号煤层赋存地质特征研究
13.
a duct that provides ventilation as in mines.
一个能通风的口,如在煤矿里就有。
14.
A study of the sintering characters and application of imported iron ores at Tangsteel
唐钢进口铁矿烧结性能研究及生产应用
15.
Application of High-Voltage Inverter in Mining Hoist of Tangan Mine Lan Hua Group
高压提升机变频器在兰花集团唐安煤矿副井上的应用
16.
Application of Fuzzy Mathematical Method on Structural Complexity Assessment in Tangzhuang Coalmine
模糊数学方法在唐庄煤矿构造复杂性评价研究中的应用
17.
The Relationship between Officers and Businessmen in the Late Qing Dynasty--An Example of Li Hong-zhang and Tang Ting-shu and Kaiping Coal Mine
晚清官商关系透视——以李鸿章、唐廷枢与开平煤矿为例
18.
Analysis on Ground Subsidence Control Mining Plan with Grouting in Overburden Separated Strata above Coal Pillar Under Railway Line in Tangshan Mine
唐山矿铁路煤柱覆岩离层注浆减沉开采方案分析