说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 南京地铁
1.
Risk Assessment for Subway Projects:Taking Nanjing Subway Line 2 as an Example
地铁工程风险评价——以南京地铁2号线为例
2.
On-line Control and Optimization for BAS of Nanjing Metro Line One;
南京地铁BAS初期在线运行与优化研究
3.
The Research on the Interior Design and Construction of the Nanking Subway No.1 Line;
南京地铁一号线室内设计与施工研究
4.
The Discussion about BT Financing Mode of Nanjing Subway Ⅱ;
浅议南京地铁二号线BT投融资模式
5.
Experimental Study on the Thermophysical Parameters of (Thawed) Soil in the Foundation of Nanjing Metro Engineering
南京地铁(融)土热物理参数试验研究
6.
A Study on the Feasibility of Ground Freezing Method in Nanjing Metro Engineering
南京地铁应用人工地层冻结法的可行性研究
7.
Nanjing Subway Soft Flow to Mould Layer Interval Tunnel Construction Technical Research;
南京地铁软流塑地层区间隧道施工技术研究
8.
Liquefaction-Induced Deformation and Anti-Seismic Measures for the Foundation of Nanjing Subway;
南京地铁地基液化变形及抗震措施研究
9.
Analysis on Major Issues of Main Transmission System of Cars for Nanjing Metro Line 1
南京地铁1号线车辆主传动系统问题分析
10.
The Analysis of Nanjing Metro Corporation Profit Pattern and Relative Policy Research;
南京地铁公司盈利模式分析及相关政策研究
11.
Innovative Design of On-board Passenger Information System for Metro Line 1 in Nanjing;
南京地铁车载旅客资讯系统创新设计与实践
12.
Research on Application of Integrative Evaluation in Tender Offer in Nanjing Metro;
综合评估法在南京地铁项目评标中应用研究
13.
Performance Evaluation for the Maintenance Systems TPM & RCM Applied in Nanjing Metro
南京地铁TPM和RCM维修体系实施效果评估
14.
Calculation and Analysis of the Construction Program in Triple-arch Section Nanjing Subway
南京地铁三联拱区段施工方案计算分析
15.
Localization of Carbon Blocks in Nanjing Metro Line 1
南京地铁1号线电客车轮缘润滑块国产化研究
16.
It20 minutes go to the centre of Nanjing underground.
乘地铁去南京市中心需要20分钟时间。
17.
Nanjing Subway Line 1 Passenger Forecasting for the Opening Period
南京市地铁1号线开通初期客流预测
18.
Adjustment and Analysis of Ventilation and Air-conditioning System in the Nanjing Subway Station
南京站地铁通风空调系统调试与分析