说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 采掘工程
1.
Excavation Engineering Charts and Management of Mineral Resources;
采掘工程图件与矿产资源管理的关系
2.
The Dynamic Managed CAD System Model of the Plan on the Colliery Excavate Engineering
煤矿采掘工程平面图动态管理CAD系统模型构造
3.
Study on the Dynamic Management System of Excavation Engineering Plans in Colliery
煤矿采掘工程平面图动态管理CAD系统研究
4.
Theoretical and Application Study on the Dynamic Visual Mining and Excavating Management System of Coal Mine
煤矿采掘工程动态可视化管理理论与应用研究
5.
Design on Fully Service Period Dynamic Management System of Mining and Excavation Engineering Drawing and Document
采掘工程图件全寿命周期动态管理系统设计
6.
(6) having an actually measured surface and underground engineering comparison drawing, a mining and excavation plan and a ventilation system drawing;
(六)有实测的井上、井下工程对照图、采掘工程平面图、通风系统图;
7.
Research and Application on Data Mining of Association Rules in Process Industry;
过程工业中关联规则采掘的研究与应用
8.
The Application Status of System Engineering in Mining Plan Optimization
系统工程在采掘计划优化中的应用现状
9.
ploration costs in extractive industries
采掘工业中的勘探成本
10.
a tool or machine used for digging or excavating.
用于挖掘或采掘的工具或机器.
11.
The miners worked at the face for 5hours.
矿工在采掘面上工作了5小时。
12.
The miners worked at the face eight hours a day.
矿工们在采掘面上每天工作八小时。
13.
The miner work at the face eight hour a day
矿工们在采掘面上每天工作八小时
14.
road resurfacing works
道路开掘或重铺工程
15.
engineering boring and drilling devices
工程钻探和掘进机械
16.
Mining Ceiling Management of Dounan Branch Mine in Mining
斗南分矿区采掘过程的顶板管理措施
17.
Cemented carbide for coal-mining tools
GB/T14445-1993煤炭采掘工具用硬质合金制品
18.
Technology of Supporting Super High Roadway in Large-height Mining Face
大采高工作面超高巷道掘进支护技术