1) construction of CFG piles
CFG桩施工
1.
This text gives a brief account of general procedures and test method for construction of CFG piles by means of long auger bored holes and pump pressurizing mixture, citing the example of pre-construction process test for pile formation carried out in construction of CFG piles for the Beijing-Shanghai high speed railway.
文章通过京沪高速铁路CFG桩施工前的成桩工艺性试验,简要介绍CFG桩长螺旋钻机成孔管内泵压混合料成桩法施工的一般步骤和试验方法。
2) CFG pile by long auger machine
长螺旋施工CFG桩
4) CFG pile
CFG桩
1.
Analysis of CFG pile settlement based on bearing capacity of single pile;
基于单桩承载力的CFG桩复合地基沉降分析
2.
The engineering application of composite foundation of CFG pile;
CFG桩复合地基在工程中的应用
3.
Experiment and analysis on capacity and settlement of CFG pile composite foundation;
CFG桩复合地基承载力及沉降分析
5) CFG
CFG桩
1.
Research of the CFG Applicationin in Jiaxing s Downtown Area;
CFG桩在嘉兴城区的应用研究
2.
The theory and design of CFG composite foundation;
CFG桩复合地基作用原理及设计
3.
The Distortion Characteristic and Influencing Factor of CFG Composite Foundation;
CFG桩复合地基变形特性及影响因素
6) cement-flyash-gravel pile
CFG桩
1.
Evaluation of the bearing capactiy of the composite foundation with cement-flyash-gravel piles in connecting engineering at the south bank of Wuhu Yangtze River Bridge;
芜湖长江大桥南岸接线工程CFG桩复合地基承载力评价
2.
Load transfer mechanism of cement-flyash-gravel pile in soft clay by high strain testing;
采用高应变动测法分析CFG桩承载力的试验研究
3.
Discussion on the method of Cement-Flyash-Gravel pile(CFG) reinforcement
浅谈水泥粉煤灰碎石桩(CFG桩)加固地层方法
补充资料:[3-(aminosulfonyl)-4-chloro-N-(2.3-dihydro-2-methyl-1H-indol-1-yl)benzamide]
分子式:C16H16ClN3O3S
分子量:365.5
CAS号:26807-65-8
性质:暂无
制备方法:暂无
用途:用于轻、中度原发性高血压。
分子量:365.5
CAS号:26807-65-8
性质:暂无
制备方法:暂无
用途:用于轻、中度原发性高血压。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条