1) Expense degree
代价度
1.
Expense degree is advanced to the just-in-time process and the scheduling method is presented to job-shop scheduling aiming to the limitation of expense degree,using the nesting of genetic algorithm to determine the delaying time.
针对准时加工的要求,代价度的概念被首次提出,并利用遗传算法的嵌套使用,对单件调度问题给出了以代价度最小为调度目标的延时开工调度方法,通过计算机的模拟得出了结果,并对交货期和延时开工/提前完工系数比两个重要参数变化而引起的调度结果的变化进行了研究。
2) institutional expense
制度代价
4) Fitness cost
适合度代价
1.
fitness cost), that is the resistant insects show the developing rate, the survival rate and fecundity are lower than susceptive individual.
昆虫抗药性的产生常伴有适合度劣势(即适合度代价),即抗性个体常表现出发育速率较慢、存活率和生殖力较低。
5) fitness costs
适合度代价
1.
The fitness costs of insect resistance to Bacillus thuringensis and their correlationship with resistance management strategy
昆虫对Bt抗性的适合度代价及其与抗性治理策略的关系
2.
This study demonstrates that resistant strain indicates fitness costs when feeding on conventional cotton leaves.
结果表明,抗性棉铃虫在取食常规棉叶后表现出一定的适合度代价。
6) eye-opening penalty(EOP)
眼图张开度代价
补充资料:代价
①购买物品所付出的钱:这件皮衣代价不小。②比喻为某种目的而付出的物力或精力。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条