说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 井筒装备安装
1)  shaft equipment installation
井筒装备安装
2)  shaft equipment
井筒装备
1.
The corrosion-proof design and practice of shaft equipment;
井筒装备防腐设计与实践
2.
Test technology and research of level force on Xulou vice-shaft equipment;
许楼副井井筒装备水平力测试技术及研究
3.
Application of die plate in shaft equipment installation of multi-purpose shaft;
模具盘在混合井井筒装备安装中的应用
3)  main shaft equipment
主井井筒装备
4)  rigid shaft furniture
刚性井筒装备
1.
The characteristics of the rigid shaft furniture structure and the force acting on the rigid shaft furniture are introduced.
介绍了刚性井筒装备结构的特性和作用在刚性井筒装备上荷载的特性。
5)  refitting pit shaft
井筒改装
6)  fix tube
安装筒
1.
The working process and character of ethoxyline injection mould for fix tube were anˉalyzed.
分析了安装筒环氧树脂注射模的工作过程和特点 ,针对原模具结构的缺点,将双分型面结构改为单分型面结构,简化了模具设计和制
补充资料:井筒钻进


井筒钻进
shaft drilling

{Ingtong zuonj旧井筒钻进(shaft drilling)用竖井钻井法掘进时,利用钻井设备钻凿竖井井筒的作业。井筒钻进、洗井和支护是竖井钻井法掘进的三大工序,其中井筒钻进是主体工序。它包括钻井准备工作、钻凿、防偏和测斜、故障处理等,所用时间占总工期的80%一85%。 准备工作在此期间应完成的工作有:平整井场,保证水、电管线及道路和通讯的畅通,钻凿井筒的检查孔,建立工业和生活福利设施,检查并安装钻井设备,制备洗井泥浆,进行综合试运转等。准备工作所需时间取决于钻井工程的规模、设备大小、施工组织的合理程度。 钻凿主要工作有:下钻、起钻、接长钻杆和钻进。下钻包括下钻头、钻头就位、接钻杆、下放钻杆钻头、接风管和混合器、接主动钻杆等工作。起钻按下钻相反的顺序进行。当主动钻杆钻到最低位置时,需接一根钻杆(又称加尺),这时要停止钻进和停止泥浆循环,把主动钻杆提出转盘,并提出风管,接长一根钻杆,重新安上风管和主动钻杆,继续钻进,依此循环不已,直至钻完整个井筒。钻进时要根据地质条件正确选择合理钻进参数,注意观察转盘、钻具运转和排碴等情况。 防偏和测斜采用钻井法掘进井筒时,对井筒偏斜率有严格要求:当钻井深度小于30om时,允许偏斜率不得超过0.1%;钻深为300~4O0m时不得超过32omm,401一SOom时不得超过400mm,501~6oom时不得超过48Omm。因此在钻进过程中必须注意防止偏斜过大。井筒偏斜的原因很多,主要有钻井设备安装不当、钻压过大、冲击层中有卵石、工作面岩层软硬不均等。针对上述原因要采取相应的有效防偏措施,及时测量井筒偏斜率。当偏斜率超过允许值时,要及时纠偏。中国矿山常用的钻井测井仪有CJ一501型,CSX-731型和超声波式等。这类测井仪的测量范围是,井筒直径小于10m,井筒深度小于50om,测量精度为l%。测井仪所适应的泥浆,其粘度要小于25Pa·s,密度小于1·39/em3,温度在10一35℃。 故障处理钻井时常见的故障有泥包钻头,跳钻,卡钻,掉钻头、刀具和风管等,井筒片帮或坍塌。一旦出现这些故障,要采取相应的措施予以处理。 (何修仁)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条