2) bridge sluice engineering
桥闸工程
3) culvert gate engineering
涵闸工程
1.
There is no assessment standard of culvert gate engineering in the municipal engineering quality assessment standard.
目前市政工程质量评定标准中尚无涵闸工程的评定标准,该文结合低水头水工建筑物程特点,对涵闸工程质量评定与验收进行了剖析。
4) shiplock engineering
船闸工程
1.
Many vertical reinforced bars need to be connected in architecture construction,especially in shiplock engineering on account of its particularity in struction.
船闸工程由于结构的特殊性,竖向钢筋直径大且数量多。
2.
This paper makes a preliminary study on such structures of back-stayed elastic thin wall as asymmetric steel piles and diaphragm walls applied in shiplock engineering,as well as on the quality faults,preventive measures,safety monitoring and quality testing of the structures.
本文对非对称型钢板桩、地下连续墙等背拉弹性薄壁墙在船闸工程中的应用及质量缺陷、防治措施、安全监测及质量检验要点等进行了初步探索。
3.
The supervision organization, supervision procedure and supervision practice which took quality control as the heart for Dayuandu Junction shiplock engineering are briefly introduced.
简要介绍大源渡枢纽船闸工程的监理机构、监理程序和以质量控制为中心的监理工作,回顾总结在监理工作中的几点体会。
5) lock
[英][lɔk] [美][lɑk]
水闸工程
1.
Application of economic analysis method in safety evaluation of locks;
经济分析法在水闸工程安全鉴定中的应用
6) lock project
船闸工程
1.
Application of 90d-design-age ultra-fine sand fly-ash concrete in a lock project;
90d设计龄期特细砂粉煤灰混凝土在某船闸工程中的应用研究
补充资料:利根川河口闸工程
利根川河口闸工程
Tonegawa River Estuary Lock Project
1 igenehuan hekouzha gongeheng利根川河口闸工程(Tonegawa RiverEstuary Loek Projeet)为解决日本利根川河口地区的盐害问题而建设的水利工程。利根川是日本流域面积最大的水系(流域面积约15800平方公里)。干流全长332公里。当河中流量小时,海水上溯达50公里,经常给农作物造成盐害。在1958年4一8月的大早期间,离河口40公里处的氯离子浓度竟达1470 ppm,远远超过水稻生长初期所容许的浓度(sooppm),使水田遭受到空前规模的盐害,损失高达4亿日元。从1965年到1971年,用6年时间修建了利根川河口闸。闸长834米,设9孔,每孔宽45米,闸墩厚4.5米。闸门为双扉,可根据潮水位、河中流量、闸上游含盐量等的变化,进行合理地操作。河口闸建成以来,盐害有所缓和,但遇到枯水年或闸门操作不当时,仍会使含盐量超过容许值,需作进一步研究。(方爱珍)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。