1) prefabricated forms
预制模板
1.
The design details of the prefabricated forms are described.
五峰麒麟观水电站碾压混凝土双曲拱坝溢流坝顶悬挑部位施工时采用钢筋混凝土预制模板,模板用内拉钢筋固定,因而节约了材料,缩短了工期,降低了工程成本。
2) precast concrete form
预制砼模板
1.
The author illustrates a new way in accordance with the case of Longtouzai Arch Dam,applying precast concrete form handling.
结合龙头寨砌石拱坝的现有施工条件 ,采用预制砼模板 ,分层、分块预制吊装等方法 ,可成功地解决高拱坝溢流面挑梁的施工技术难题 。
3) prefabricated steel-template
预制钢模板
4) prefabricated shuttering units
预制模板<林>
5) prediction mask
预测模板
1.
Aiming at the different characteristics of different components of infrared image under cloudy sky background,on the basis of background prediction algorithm of the infrared point target detection,this paper analyzed and compared the performances which three background prediction masks behaved in the detection process of background prediction,background suppression and threshold segmentation.
针对云天背景下红外图像中不同的背景成分所具有的不同特性以及它们之间的差异,本文从基于背景预测模型的红外点目标检测方法出发,重点分析和对比了三种背景预测模板在背景预测、背景消除和阈值分割三个检测过程中,对不同的背景成分表现出的不同处理性能。
6) precast arch board
预制弧板
1.
The experimental study of high strength reinforced concrete precast arch board shaft wall in frozen shaft;
冻结井高强钢筋混凝土预制弧板井壁试验研究
补充资料:预制
1.预先制造的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条