说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 炮采放顶煤工作面
1)  blasting coal face with sublevel caving
炮采放顶煤工作面
2)  fully mechanized top coal caving face
综采放顶煤工作面
1.
Based on the analysis of surrounding rock movement of an old roof collapsed roadway parallel to a fully mechanized top coal caving face, the new technique of filling this kind of roadway with the material with high water content was put forward.
基于对综采放顶煤工作面高冒空巷围岩活动规律的分析 ,采用高水速凝材料充填高冒空巷 。
3)  fully mechanized coal face with top-coal drawing
放顶煤综采工作面
1.
Application of water-spraying dust control technique for the fully mechanized coal face with top-coal drawing;
喷雾降尘技术在放顶煤综采工作面的应用
4)  caving-working-face
炮采放顶煤
1.
Research on Law of the Presentation of the Mine Pressure with caving-working-face
炮采放顶煤工作面矿压显现规律研究
5)  top-coal caving face
放顶煤工作面
1.
The ZDYJ-ⅡB infrared instrument was used to observe the strata and the strata behavior of C142 top-coal caving face of Ciyaopu No.
为了研究高韧性煤层综采放顶煤工作面的矿压显现规律,采用ZDYJ-ⅡB红外式综采支架压力监测仪,对宁夏磁窑堡二矿C142高韧性煤层综放工作面矿压进行了监测。
2.
The special emphasis is put on studying the changes of caving zone height and rock-fracture zone position in top-coal caving face of the down-seam after excavation of the upper-seam.
根据相似理论,以义马常村煤矿开采条件为地质原型,采用中比例相似材料模型进行重复试验,研究近距离煤层上层煤开采时顶板岩层移动特征,重点研究上层煤采后下层煤放顶煤开采时,垮落带高度和裂隙带层位的变化,揭示了“砌体梁”结构向高层位的发展,以及“岩-矸”类拱结构的存在,说明了放顶煤工作面以静载荷为主、动载系数较小的原因。
6)  Caving mining face
放顶煤工作面
1.
Introduces technical parameter,structure characteristic,manufacture and under ground test of SGZ730/110 type conveyor before supports and conveyor behind supports that use in a shortwall all mechanise caving mining face.
详细地介绍了用于短壁综采放顶煤工作面的SGZ730/110型前、后部刮板输送机的主要技术参数、结构特点、制造及井下试验情况。
补充资料:综采放顶煤
  综采放顶煤:厚煤层煤炭开采技术之一。把原来分层开采的煤炭,一次采完。方法是,在煤层底部按传统方法开采,使上面的煤炭在矿压的作用下,自动落下来。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条