1) main gravity shaft stoppage
主溜井堵塞
1.
Based on example of main gravity shaft stoppage disposal in Sijiaying Iron Ore Mine,the main reasons for stoppage and the usual disposal methods & experiences are explained.
通过唐钢司家营铁矿在基建期间主溜井堵塞处理实例,对其堵塞的主要原因做了系统分析,介绍了不同类型的堵塞事故常用处理方法及经验。
2) ore pass choking-up
溜井堵塞
1.
Reason analysis and treatment of ore pass choking-up;
溜井堵塞原因分析及处理方法
3) Blocking of drawpoint or orepass
漏斗溜井堵塞
1.
Blocking of drawpoint or orepass is often happened during drawing process.
漏斗溜井堵塞在井下放矿作业中经常发生,用普通爆破法处理堵塞时,作业极为困难和危险。
4) Main ore pass
主溜矿井
5) main chute
主溜井
1.
Anti-well machine is successfully used in the construction of main chute on Saxi wolfram mine,completing the deepest Anti-well project with the depth of 426.
针对洒西钨矿主溜井围岩硬度大、井深、局部井段岩层裂隙发育、风化严重等特点,采用导井反井法环保、高效、安全的完成深424。
2.
Raise-boring machine is successfully used in the construction of main chute on Saxi wolfram mine,the construction method is reasonable,much experience is provided for the follow main chute construction.
针对洒西钨矿主溜井围岩硬度大、井深、局部井段岩层裂隙发育、风化严重等特点,采用导井反井法,环保、高效、安全的完成深424。
6) polymer well choking
聚井堵塞