您的位置:首页 -> 词典 -> 不利地质情况
1)  unfavorable geographical condition
不利地质情况
1.
The unfavorable geographical conditions such as high water level,sludge and shifting sands,hard piling down to the underground rock will have a strong impact on the normal construction of the manual-excavated pile.
人工挖孔灌注桩施工,经常会遇到高水位、淤泥、流砂及无法嵌岩等不利地质情况,严重影响施工正常进行。
2)  adverse ground condition
不利的地面情况
3)  adverse geological condition
不良地质情况
4)  geologic condition
地质情况
1.
The geologic condition of the bearing layer was probed with GPR to ensure the safety and high quality of pile foundation construction.
佑溪大桥#5桩位地形复杂,为确保桩基础的施工安全和施工质量,采用地质雷达对#5桩的持力层进行探测,探明了持力层的地质情况。
5)  geological condition
地质情况
1.
Combined with foundation pit supporting engineering of coal transport system in one power plant the geological conditions of underground passageway are discussed.
对某电厂工程输煤系统通廊基坑支护工程的具体情况进行了介绍,探讨了输煤系统地段的地质情况,对该工程地下通廊基坑钢板桩支护进行了验算,以保证基坑工程施工安全,从而保证施工顺利进行。
2.
It introduces the red clay,points out the red clay foundation is one good foundation in the civil construction project,and brings forward the corresponding measures solving the problems in the geological conditions of crack,ground burrow and clint in the red clay foundation projects,which will supply reference to the red clay foundation projects.
对红粘土进行了介绍,指出了红粘土地基是土木建筑工程中的良好地基,针对红粘土地基工程中经常出现的裂隙、土洞、石芽等复杂地质情况,提出了一些解决此类问题的措施,以供红粘土地基工程参考借鉴。
3.
Discussion was made with engineering cases on how to choose pile-driving machine in large diameter bored cast-in-place pile construction in different geological conditions,so as to increase construction efficiency.
结合工程实例,讨论了在大口径钻孔灌注桩施工中,如何针对具体地质情况选择不同的桩机的问题,从而提高施工效率。
6)  worst condition
最不利情况
1.
The design parameters in the worst condition were proposed in order to guarantee the safety.
三峡坝址河床覆盖层淤砂较厚,围堰工程施工设计又不能清除,针对堰基设计需要,对淤砂用作围堰基础的物理力学参数进行了试验研究和资料分析,提出了设计分析最不利情况的设计参数,以策安全。
补充资料:不利
1.有害;没有好处。 2.不顺利;不能取胜。 3.不锋利。