1) Pressure recurrence
压力递推
3) ITFM
推力传递法
1.
Based on the detailed investigation of the Majiagou landslide in the Three Gorges Reservoir of Changjiang River, this paper expatiates on the characters and the genetic mechanism of these geologic bodies, and calculates the stabilities of the landslide to the main dangerous landslides under different loads by use of the imbalance thrust force method(ITFM), evaluating the stabilities of them.
在对长江三峡库区秭归县马家沟滑坡的详细勘测基础上,阐述了其特征和成因机制,并采用推力传递法对主滑剖面按不同工况进行了稳定性计算,评价了其稳定性,在此基础上提出了以抗滑桩、地表排水相结合的治理方案。
4) pressure decline
压力递减
1.
A Model with pressure decline curve for acid fracturing wells;
酸压井压后压力递减分析模型
2.
The pressure decline analysis method for acid fracturing well is a kind of "curve fitting" method whose main idea is simulating the physical and chemical changes before and after pump off,and whose main line is the material balance equation.
为了对酸化压裂井压后裂缝参数进行准确的分析和解释,以模拟停泵前后裂缝内的物理、化学变化过程为思路,以停泵后缝内的物质平衡方程为主线,建立酸化压裂井停泵后的缝内压力递减模型,并提出了针对酸化压裂井裂缝参数解释、评估的“曲线拟合”法。
3.
On the basis of analysis of pressure decline curve in hydraulic fracturing, the key of 2-D fracture model analysis is the determination of fitting pressure.
在水力压裂压力递减曲线分析中 ,对二维裂缝模型分析问题的关键是拟合压力的确定 ,因为拟合压力的准确程度将直接影响压裂液滤失系数、裂缝几何尺寸等参数的可靠性。
5) pressure transmission
压力传递
1.
Evaluating the hole stabilizing performance of silicate-based drilling fluid with pressure transmission test;
利用压力传递实验技术评价硅酸盐钻井液井壁稳定性能
2.
The formulas of calculating extraordinary low permeability and semipermeable membrane efficiency of shales through pressure transmission technique were deduced.
为进一步深入井壁稳定机理研究,利用压力传递原理推导了泥页岩极低渗透率计算公式,并给出了半透膜效率的计算公式,研制了泥页岩水化力学耦合模拟实验装置(SHM仪),建立了压力传递实验新方法。
3.
On the basis of analyzing the principle of shale membrane efficiency testing, formulae are derived for calculating the membrane efficiency by using pressure transmission technique.
在对泥页岩膜效率测试原理分析的基础上,推导了通过压力传递技术测定泥页岩膜效率的计算公式,并研制了泥页岩膜效率测试装置。
6) gradient of pressure
压力递变
补充资料:可递延成本与不可递延成本(deferrablecostandundeferrablecost)
可递延成本是指在企业财务负担能力有限的情况下,对已决定选用的某一方案推迟执行,或将方案中的某一些费用延迟到以后期内再发生等等,这种与推迟方案有关或与延迟支出有关的费用,称为可递延成本,有时也称之为可延缓成本。
不可递延成本是指已选定的某一项方案,或某些执行方案中的某些支出,即使在企业财务负担能力有限的情况下,也不能推迟执行,否则便会对整个经营或投资过程产生重大不利影响。这种与已选定方案有关的,或与方案中某些支出有关的费用,称灾为不可递延成本,也可称之为不可延缓成本。
之所以将成本分为可递延和不可递延,是要求我们在决策过程中,充分注意各项决策相关成本。在企业财务负担能力有限的情况下,应分别轻重缓急,依次排队,量力而行。只有这样,才能更有效地运用现有的资金,提高资金的利用率,最大限度地提高企业经营效益。
不可递延成本是指已选定的某一项方案,或某些执行方案中的某些支出,即使在企业财务负担能力有限的情况下,也不能推迟执行,否则便会对整个经营或投资过程产生重大不利影响。这种与已选定方案有关的,或与方案中某些支出有关的费用,称灾为不可递延成本,也可称之为不可延缓成本。
之所以将成本分为可递延和不可递延,是要求我们在决策过程中,充分注意各项决策相关成本。在企业财务负担能力有限的情况下,应分别轻重缓急,依次排队,量力而行。只有这样,才能更有效地运用现有的资金,提高资金的利用率,最大限度地提高企业经营效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条