1) rise column
升柱
2) column temperature rise
柱箱升温
3) cut-off pillar and jacking
断柱顶升
1.
It analyses the reasons of the declivity happen of one domestic,applies the anchor arm static press pile strengthening the basis,introduces the strengthen construction technology of anchor arm static press pile,adapts the parts cut-off pillar and jacking to correct a error,and practice illustrates that the methods has a good result,can be a reference to the other similar projects.
分析了某民房突然倾斜事故的原因,运用锚杆静压桩进行基础加固,对锚杆静压桩加固施工工艺进行了介绍,采用局部断柱顶升法进行纠偏,实践证明该法效果良好,以供其他类似工程参考借鉴。
4) rising pillar above beam
梁上升柱
5) lifting column
升降柱
6) lifting plug
提升柱销
补充资料:天柱山天柱峰
天柱峰又称为皖伯尖,万山尖。《道书》称为司命真人发祥所都,海拔1488.4米,孤立晴宵,顶天立地,石骨嶙峋,峭立如柱。五指、莲花、天池、含珠、飞来、月华诸峰拱卫左右,奇松、怪石、云海、佛光、各领风骚。李白《江上望皖公山》诗云:“奇峰出奇云,秀水含秀气。”白居易《题天柱峰》诗云:“天柱一峰擎日月,洞门千仞锁云雷。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。