1) Piston fracture
活塞断裂
3) piston ring breakage
活塞环断裂
4) plunger break
柱塞断裂
5) fault activity
断裂活动
1.
Control of fault activity on hydrocarbon accumulation in central Junggar Basin;
准噶尔盆地腹部断裂活动对油气聚集的控制作用
2.
SEM characteristics of quartz grains in fault clay and fault activity in Jinchuan hydroelectric power station dam area;
金川水电站坝区主要断裂断层泥中石英碎砾表面SEM特征及断裂活动性
3.
Crustal extension and fault activity during the Mesozoic-Cenozoic in the Jiyang Depression and the Luxi Uplift,East China;
济阳坳陷及鲁西隆起区中、新生代伸展与断裂活动特征
6) Active faults
活动断裂
1.
Influence of coseismic deformation of the Wenchuan earthquake on the occurrence of earthquakes on active faults in Sichuan-Yunnan region
汶川地震同震形变场对川滇地区主要活动断裂地震发生趋势的影响
2.
The paper analyzes the occurrence regularity of rock burst of about 263 times in Laohutai mine field by database, the osculating relations of rock burst and active faults were summarized.
应用数据库对老虎台井田其发生的 263 次冲击地压之统计分析表明,岩体动力现象与活动断裂有密切关系。
3.
Geodynamic zoning is used to determine active faults successively with topographic map and other methods, and to reveal regional block construction of rockmass in the crust, and to evaluate their mechanical conditions.
地质动力区划方法逐级使用地形测量图并结合其它方法查清活动断裂,用以揭示地壳的区域岩体断块结构以及评估其力学状态。
补充资料:螺杆-活塞式注塑
分子式:
CAS号:
性质:螺杆只塑化而不进行往复运动,材料塑化后通过止逆阀送入蓄料室,再依靠活塞将熔融物料压入模具的成型方法。
CAS号:
性质:螺杆只塑化而不进行往复运动,材料塑化后通过止逆阀送入蓄料室,再依靠活塞将熔融物料压入模具的成型方法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条