1) due-date assignment
交货期设置
1.
A three-tier structure of due-date assignment model was constructed to forecast due-date by using the statistical analysis method and queuing theory.
交货期设置是晶圆制造车间控制的重要任务之一。
2) Futures Exchanges
期货交货所
3) futures transaction
期货交易
1.
By studying the trends of the domestic and foreign country power markets, the three transaction modes, spot transaction, futures transaction and forward contract transaction, are analyzed and compared.
通过研究国内外电力市场发展趋势 ,分析比较了电力市场现货交易、期货交易以及远期合约交易 3种交易方式。
2.
Applying the recent contract theory,the paper analyzed three transaction mode: ① market transaction,that the two firms ex post renegotiate surplus;② contract transaction,a bilateral contract transaction mode;and ③ futures transaction,a multi-side contract transaction mode.
运用最新的合同经济学理论,分析了企业可能面临的3种交易模式:市场交易,事后再谈判剩余的交易模式;合约交易,双边的合约交易模式;期货交易,多边的合约交易模式。
3.
Based on a comparative study of China s futures accounting standard and the accounting standard practised in the American futures market, the article points to reconsideration of futures transaction accounting.
本文从目前我国期货核算的现状,比较美国的期货会计准则,浅谈对我国期货交易核算的几点思考。
4) delivery time
交货期
1.
A Study on Decision Model of Supply Chain Coordination Subject to Random Delivery Time;
基于随机交货期的供应链协调决策模型研究
2.
A Study on Decisions of Premium Pricing and Crashing Cost Sharing Oriented to Shortening Delivery Time;
面向缩短交货期的价格补偿定价及新增费用分担决策研究
3.
Delivery Time of MTO Companies Based on Risk-averse
基于损失规避的MTO企业交货期研究
5) futures trade
期货交易
1.
Cost analysis in generation company in futures trade;
期货交易下的发电公司运行成本分析
2.
Economic legal analysis on futures trade relationship;
期货交易基本关系的经济法分析
6) Due dates
交货期
1.
It can not reveal production costs and due dates.
传统的产品配置仅仅对产品零部件做组合上的修改,不能显示产品成本和交货期等信息。
2.
This paper presents a reverse scheduling algorithm of solving Job\|Shop scheduling problem with due dates by adopting “processing efficiency”and introducing “virtual operation” and “virtual machine”.
提出了一种以“加工效率”为主要参数,并引入“虚工序”、“虚机器”求解有交货期的单件车间调度问题的逆序算法。
3.
This paper presents a reverse scheduling algorithm of solving Job-shop scheduling problem with due dates by adopting ″processing efficiency″ and introducing ″virtual operation″ and"virtual machine".
在提出的以“加工效率”为主要参数,并引入“虚工序”、“虚机器”求解有交货期的单件车间调度问题的逆序算法的基础上,进一步改进了该算法,并在VBAForProject中实现了该算法。
补充资料:交货
1.根据买卖双方的协定,一方把货物交付给另一方。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条