1) nodal virtual flux
节点虚流量
1.
To improve the procedure of nodal virtual flux,the virtual flux is deducted rigorously and theory of the disposed nodal virtual flux is further perfected.
对节点虚流量法进行了改进,严格扣除过渡区中虚流量贡献,使虚流流量的处理在理论上更严密,关键的溢出点位置计算更精细。
3) Invariable lattice node virtual flow method
不变网格节点虚流量法
4) node flow
节点流量
1.
55 is generally used as flow conversion coefficient for distributing the way leak flow into the near node flow,and the error of calculation result is large sometimes,even exceeds the range of engineering precision.
55的流量折算系数把途泄流量分配到相邻的节点流量中,其计算结果有时误差较大,甚至超出工程精度要求。
5) nodal flow
节点流量
1.
The simulated calculation of nodal flow in sewage pipe network system is the essential work for the planning design and operation management of the urban sewage pipe network system.
污水管网系统节点流量模拟计算是城市污水管网系统规划设计和运行管理的基础性工作。
2.
In order to undertake the hydraulic analysis of urban sanitary sewer networks, the stochastic simulation of the nodal flow series is conducted in the paper.
为了进行城市污水管网系统的水力分析,对管网节点流量过程进行了随机模拟。
3.
This paper puts forward a new method of theoretic calculation pondering the random changes of nodal flow being determined by pressures,which can reach solutions with nodal flow and pressure,and computational example are induced showing the correctness and applicability of the method.
方法考虑节点流量随节点水压的动态变化,提出一种新的管网水力计算方法。
6) node demand
节点流量
1.
Based on the necessity of node demand calculation in probability statistics method, the pap.
传统的节点流量分配计算方法不尽合理,基于概率统计方法计算节点流量的研究具有其必要性,本文详细介绍了节点流量随机模型,以新的角度研究管网节点流量的概率统计特性,在一定程度上解决传统节点流量分配计算方法的不合理之处。
2.
The uncertainty of node demand is an existing difficulty in modeling.
本文针对管网建模中存在的困难:节点流量的不确定性,提出了节点流量的率定方法。
补充资料:节点
分子式:
CAS号:
性质: 又称结点。是有向图中的符号。将工艺流程图抽象为信息流程图时,常用有向图来表示。有向图由节点和有向支线构成,用来表达流程信息结构。节点通常与单元设备对应(但不必严格地一一对应),有向支线则与流股相对应。这种表达是矩阵表示的基础。
CAS号:
性质: 又称结点。是有向图中的符号。将工艺流程图抽象为信息流程图时,常用有向图来表示。有向图由节点和有向支线构成,用来表达流程信息结构。节点通常与单元设备对应(但不必严格地一一对应),有向支线则与流股相对应。这种表达是矩阵表示的基础。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条