1)  site commissioning
现场启动调试
1.
The paper introduces the site commissioning procedures, analyzes and demonstrates the starting principle and procedure for the first starting.
本文结合工程实际,详细叙述了抽水蓄能机组现场启动调试的步骤和顺序,并就电站首机首次启动方式进行了分析和论证。
2)  start-up and commissioning
启动调试
1.
The procedure of start-up and commissioning program of gas-steam combined cycle power plant has its special features.
燃气-蒸汽联合循环电站启动调试工作程序有其自身的特殊性,本文简要介绍郑州燃气电站机组主要启动调试程序、重要调试项目,供同类机组调试参考。
2.
8-1 type circulating fluidized bed boiler; analyzes the cold fluidized test, combustion optimization, loop seal type recycle device and bottom ash cooler operation modes during the start-up and commissioning process of boiler.
8-1型循环流化床锅炉结构、系统布置特点、热力参数、煤质特性等;分析锅炉启动调试过程中的冷态流化试验、燃烧调整及回料器与冷渣器的运行方式。
3)  field debug
现场调试
1.
The use and field debug of DCS600 whole digit DC speed variable system were discussed, with emphasis on the manual and automatic optimizing process for armature circuit, exciting circuit.
论述了全数字直流调速装置DCS600的使用及现场调试,重点阐述了电枢回路、励磁回路参数的手动和自动最优化过程,使全数字直流调速系统的参数达到最优化,为使用该系统提供了一定的参考价值。
4)  field debugging
现场调试
1.
In the light of the problems existing in the debugging of the comprehensive automated transformer substation,this paper sums up many years experiences of the field debugging of the comprehensive automated system,advances some procedures of and some matters needing attention in the field debugging,and introduces some methods for solving these common problems.
针对变电所综合自动化系统调试中存在的问题,总结了多年综合自动化系统现场调试的经验,提出了现场调试步骤及注意事项,并介绍了常见问题的解决方法。
2.
Aiming at the characteristics of Xuangang raw material conveying system project,the author adopts a new machine control device,that is,the soft starter,describes the control ways and methods of the soft starter,and compares it with traditional start way,gets field debugging at the same time,thus getting the protection machine effect.
针对宣钢原料输送系统工程的特点,采用了一种新颖电机控制装置———软起动器,阐述了软起动器的控制方式及优点,并与传统起动方式作了对比,同时进行了现场调试,从而起到保护电机的作用。
5)  Startup and commissioning
启动与调试
1.
Startup and commissioning of A~2/O municipal wastewater treatment plant;
A~2/O工艺城市污水处理厂的启动与调试
6)  spot investigation
现场调查试验
补充资料:现场
1.发生案件或事故的场所及当时的状况。 2.直接从事生产﹑工作﹑试验的场所。