说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 明洞工程
1)  open-cut tunnel construction
明洞工程
2)  tunnel engineering
隧洞工程
1.
Summarizing experiences in construction management of tunnel engineering,this paper discusses how to set up an effective encouraging mechanism in construction and management of tunneling engineering in order to fully mobilize the enthusiasm of the masses and to enhance the level of construction management.
通过对隧洞工程施工管理经验的总结 ,介绍了在隧洞工程的施工管理中如何建立有效的激励机制以充分地调动员工的积极性 ,从而提高隧洞工程的施工管理水平。
2.
Dahuofang Reservoir Water Diversion Tunnel Engineering is the longest tunnel engineering in the world at present.
针对本工程实际,以循环运行网络模拟理论为基础,建立了隧洞工程掘进机法施工过程模拟模型,并开发了相应模拟计算软件。
3.
Constructing condition of tunnel engineering is very complicated ,and the variable factor is much more ,and the past experiencing safety management are not adapted to requirement of modern management ,so the modern science management method -system safety engineering-come into being .
隧洞工程的施工条件是非常复杂的,并且存在的不稳定因素比较多,安全隐患很大。
3)  tunnel project
隧洞工程
1.
Taking the tunnel project of Jingshi Superhighway in south-to-north water diversion project as the example, this paper expounds the excavation method, quality control measures and construction points of tunnel project passing through the silt stratum.
以南水北调穿越京石高速隧洞工程为例,叙述了通过粉砂地层隧洞工程的开挖方法、质量保障措施及施工要点。
2.
Starting from speciality of tunnel project construction,it illustrates contractor’s claim to tunnel construction and points out importance & necessity of claim to contractors from aspects of work of priparation,propoundation of claim and noteworthy items.
从隧洞工程施工的特殊性出发 ,阐述了承包商对隧洞施工索赔中的准备工作、提出索赔及索赔的注意事项 ,指出索赔对承包商的重要性和必要性。
4)  tunneling project
隧洞工程
1.
The construction condition of hydraulic tunneling project is always very complicated with more variable factors.
水工隧洞工程是施工条件非常复杂的,并且存在的不稳定因素比较多,过去的经验型安全管理已不能适应现代化管理的需要。
5)  Dongping Hydroproject
洞坪工程
1.
Quality control on concrete production in Dongping Hydroproject;
洞坪工程混凝土生产质量控制
2.
The outline of Dongping hydroproject and the design on its main structures are described, the focal points are on the design of arch dam, flood discharge structures, energy dissipation structures and electric power generation structures.
介绍了洞坪工程概况及枢纽主要建筑物组成;重点阐述了大坝挡水建筑物、泄洪消能建筑物的主要设计成果,介绍了发电系统建筑物布置。
6)  Tunnel construction
隧洞工程
1.
Based on the field engineering geological reconnaissance and the engineering geological classification of and evaluation on the wall -rock, this paper analyzes and evaluates the geological condition of general trunk tunnel construction from NO.
在野外工程地质勘察及洞室围岩工程地质分类评分的基础上,对张峰水库总干16至20号隧洞工程地质条件进行了分析与评价。
补充资料:明洞
明洞
opencut tunnel

   用明挖法在路堑或半路堑中修建衬砌结构,并在其外表回填土石的隧道。主要用于遭受塌方、落石或流石、流泥危害的隧道洞口或路堑地段。明洞的结构根据地形、地质、回填土状况而定。通常由顶部结构和边墙组成。顶部作成拱形的,称拱式明洞。顶部为梁板的称为棚洞。明洞衬砌材料一般都用混凝土或钢筋混凝土,边墙亦可用浆砌片石。洞顶要铺设防水层,再回填 1米以上的土石 ,作为其上落石的缓冲层。回填土上再铺设粘土隔水层和修建排水沟。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条