1) deformation at station points
测站点变形
2) deform detection point
变形测点
1.
Aiming at the existing situation that it is high difficulty of using cradle casting construction of continue box beam bridge,it introduces the laying out methods of deform detection point and pressure detection point in the construction of the project,and analyses the detection effect.
针对连续箱梁桥采用挂篮现浇悬臂施工难度大的现状,介绍了其工程施工中变形测点和应力测点的布置方法,并分析了其监控结果,通过现场施工,证明了该桥的施工控制达到了设计要求。
3) wet environment
测点变形
1.
This paper analyzes some issues occurred in dam deformation monitoring,including wet environment,facilities disturbed by external condition,refraction influence,mark deformation,few datum value obtained before impounded.
对大坝变形监测中存在的环境潮湿、设备受各种外界条件干扰、折光影响、测点变形、蓄水期前很少测得大坝监测的基准值等问题进行分析,并根据实践提出一些看法。
4) distortion monitoring points
变形监测点
5) observation station for distortion
变形观测点
6) survey station
测点,测站
补充资料:大坝内部变形观测(见水工建筑物变形观测)
大坝内部变形观测(见水工建筑物变形观测)
daba neibubianxing guanCe大坝内部变形观测见水工建筑物变形观测。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。