说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 二级主槽
1)  secondary main channel
二级主槽
1.
By analysis of the characteristics of the channal cross-sections of the Lower Yellow River, a new concept is presented that there exists a "secondary main channel" in the Lower Yellow River.
通过分析黄河下游河道的断面特征,提出黄河下游存在二级主槽的新概念,并基于此理论分析确定了新河道整治方案下的主要设计参数,定性分析了输沙能力的变化趋势,为以后进一步开展河道整治提供了新的思路。
2)  sub master
二级主站
1.
The two level schemes of master station of distribution automation are presented in this paper and the functions of a sub master station for distribution automation are emphatically described.
重点介绍配电自动化二级主站的功能和作用。
3)  2~(nd) Tie Active Distributor
二级主动分销商
4)  main-channel
主槽
1.
Flood volume required for keeping the main-channel from shrinkage in the lower Yellow River;
维持黄河下游主槽平滩流量4000m~3/s所需水量
2.
This paper shows that the flow for maintaining the capacity discharge of the main-channel in the lower reaches of the Yellow River should be larger than 4 000 m3/s, the flow for maintaining the capacity discharge of the main-channel in Inner Mongolia reaches should be larger than.
结合黄河特点,分别分析了维持下游和宁蒙河段良好主槽、兰州以下河段全面实现III类水、重要保护鸟类或鱼类的种类或数量恢复到20世纪90年代初期水平3方面所需要的径流条件,并充分考虑黄河应承担的社会功能,给出了现阶段可基本实现黄河自然功能和社会功能均衡发挥的各河段环境流建议。
5)  main channel
主槽
1.
According to the flow state in flume for spur and experimental data, the formulas for the mean velocity of main channel varying with distance downstream were derived with momentum principle.
本文根据丁坝作用后水槽中水流情况,采用动量方程结合试验资料,导出了丁坝下游主槽平均流速沿程变化的公式,以此为基础,提出了丁坝作用下河床冲刷段长度的计算公式。
2.
By using this method, the main channel and flood protection embankment are basically formed during construction.
主槽与防洪堤基本成型,新河部分土方人工开挖,其余部分借助水力自然冲刷,使得工程一气呵成的同时,工程量也显著降低,并能最快发挥效益。
3.
Formulas used to determine the local head losses of single submerged dike and the mean velocity of main channel varying with distance downstreamare derived.
根据水槽中淹没丁坝群的水流流态,将下坝附近的水流进行分区,导出淹没丁坝下游主槽流速沿程变化公式,并且结合由淹没单丁坝时得出的水头损失计算公式,可以对不同坝长、坝高和丁坝间距、淹没丁坝群的局部水头损失进行计算。
6)  autonomy of secondary colleges
二级学院办学自主权
补充资料:拉格朗德二级水电站
拉格朗德二级水电站
La Grande-2 Hydroelectric Power Station

   加拿大魁北克省境内拉格朗德河梯级开发中(自下而上)的第二级水电站。距河口117千米。是加拿大最大的水电站。控制流域面积(包括跨流域引水控制面积)3875平方千米。通过跨流域引水后,平均年径流量为927亿立方米。基岩为花岗岩,覆盖层厚20米。斜心墙堆石坝最大坝高168米,坝顶长2835米。另有副坝29座。总库容617亿立方米。主厂房长483.4米、宽26.5米、高47.3米,是世界上最大的地下厂房。总装机容量532.8万千瓦。多年平均年发电量358亿千瓦·时。泄洪设施为岸边溢洪道,泄量达15300立方米/秒。工程于1973年开工,1982年竣工。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条