说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 官地混凝土重力坝
1)  Guandi Concrete Gravity Dam
官地混凝土重力坝
2)  concrete gravity dam
混凝土重力坝
1.
Study on the integrated dynamic characteristics of a concrete gravity dam;
混凝土重力坝整体动力特性研究
2.
Numerical method for analysis of seismic response of concrete gravity dams;
混凝土重力坝地震响应数值分析方法
3.
Analysis on monitoring data of concrete gravity dam on rock foundation for Daheiting Reservoir;
大黑汀水库岩基混凝土重力坝监测数据分析
3)  concrete gravity-arch dam
混凝土重力拱坝
1.
In the light of the selection of dam type of Shigaoshan Reservoir, this paper analyzes the topography, geomorphology and the dam type geology, and selects the plan of concrete gravity-arch dam.
针对石膏山水库坝型的选择,分析了地形地貌和坝型地质条件,选择了混凝土重力拱坝方案。
4)  High concrete gravity dam
高混凝土重力坝
5)  RCC gravity dam
碾压混凝土重力坝
1.
Study on effects of transverse joints space on thermal stress of Jinanqiao RCC gravity dam;
横缝间距对金安桥碾压混凝土重力坝温度应力的影响研究
2.
Design of RCC Gravity Dam of Jin anqiao Hydropower Station;
金安桥水电站碾压混凝土重力坝设计
3.
Analysis on potential seepage of RCC gravity dam for Wanyao Reservoir;
碗窑水库碾压混凝土重力坝渗流“疑点”分析
6)  roller compacted concrete gravity dam
碾压混凝土重力坝
1.
Analysis of seepage characteristics of Jiangya roller compacted concrete gravity dam;
江垭碾压混凝土重力坝渗流特性分析
2.
in the construction of the roller compacted concrete gravity dam,which is successfully applied to some foreign projects,but is not applied in China.
混凝土面墙技术具有能够适应碾压混凝土重力坝快速施工、缩短工期,降低模板造价等优点,已在国外一些工程中成功应用,国内目前尚未使用。
3.
Zhouba hydropower dam is the full-face roller compacted concrete gravity dam.
四川舟坝水电站大坝为全断面碾压混凝土重力坝,采用左右两块全断面薄层通仓连续交替上升工艺施工。
补充资料:官地
1.属于官府的土地。 2.指为大家所共有的土地。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条