1) Payment Scheduling
支付进度
1.
Dynamic Project Duration Optimization by Considering Payment Scheduling
考虑支付进度的动态工期优化
2) Payment Scheduling
支付进度安排
1.
The assumptions of the study are given and multi-mode project payment scheduling problem(MPPSP) is identified firstly.
本文首先明确了研究的假设条件并对多模式项目支付进度问题(MPPSP)进行了界定;随后从承包商和业主两个角度构建了MPPSP的基本优化模型;鉴于支付方式的不同,将基本优化模型扩展为基于进展、基于时间和基于费用的MPPSP优化模型;最后,通过对一个算例的计算分析,讨论了支付方式对最优支付进度安排及合同双方收益的影响。
3) project payment scheduling
支付进度安排
1.
Taking a practical engineering project,JZDWBD-Ⅴ,as background,this paper studies the project payment scheduling problem.
本文以一个具有代表性的实际工程项目——JZDWBD-Ⅴ为对象,对支付进度安排问题进行研究。
2.
The assumptions of multi-mode project payment scheduling problemsare identified and MPPSP is defined firstly Then the optimal models of MPPSPare constructed from contractor s and client s viewpoints respectively In light ofthe characteristics of the problem, a special simulated annealing heuristics with twomodules is developed.
首先明确了研究的假设条件并对多模式项目支付进度问题MPPSP进行了界定;随后分别从承包商和业主两个角度构建了MPPSP的优化模型;针对MPPSP的特点,设计了双模块模拟退火启发式算法TMSAH;最后,通过一个算例对本文的成果进行了说明并分析了影响最优支付进度安排及项目收益的各种因素。
4) progressive payment for works
进度款支付方法
5) project payment scheduling
项目支付进度安排
1.
This paper studies the project payment scheduling problem where activities may be performed with several modes.
研究了活动具有多种执行模式的项目支付进度安排问题,目的是寻求使项目收益最大化的支付进度包括支付事件,支付量以及与之相联系的活动执行模式和事件实现时间的安排。
6) Joint Payment Schedule of Projects
项目联合支付进度
1.
A Study on Allocation of Financing Costs and Joint Payment Schedule of Projects;
首先对研究所用到的符号进行定义 ,随后讨论项目融资费用分担及合同双方收益问题 ,在此基础上构建一个由两个优化模型组成的项目联合支付进度数学模型 ,通过求解该模型可以得到使双方联合收益最大化且按商定比例分担项目融资费用的支付进度安排 ,最后通过一个算例对其的研究成果进行了说
补充资料:支付
1.付出,付给。多指付款。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。