1) temporary substation
临时变
1.
An interim scheme for solving power supply-demand contradiction with a kind of 35kV simple temporary substation
解决供电矛盾的较佳过渡方案—一种简易临时变介绍
3) the nonce variant
临时变体
1.
The paper focuses on the nonce variant of English idioms by two aspects: what accounts for its formation,and into which types it could be divided.
文章以英语习语的临时变体为研究对象,从语言的特性、语言与社会的关系、语言经济原则和语境对语言的约束力,以及语言运用者的心理因素几方面分析了英语习语临时变体产生的原因;对英语习语临时变体形成的几种主要方式,如扩充、压缩、替换、拆分和移位作了分类阐述;最后简要总结了临时变体的功能。
2.
This paper examines the nonce variant of English idioms, paying attention to three questions in particular: what accounts for its formation, into which types it could be divided, and what rhetorical effects it is capable of producing.
本文以英语习语的临时变体为研究对象,探讨了英语习语临时变体出现的原因、主要种类及其修辞意义。
4) running modification
临时变化
5) temporary transformer station
临时变电所
1.
A power energy measurement and long distance meter-copy system is introduced according to the features of the temporary transformer station in oil field.
文章根据油田可移动临时变电所的特点,介绍了其电能计量远方抄表系统。
6) time-critical variable
临界时间变量
补充资料:关于临时建设和临时用地
临时建设是指必须限期拆除、结构简易、临时性的建筑物、构筑物、道路、管线或其他设施;临时用地是指由于建设工程施工、堆料或其他原因,需要临时使用并限期收回的土地。批准临时建设和临时用地的使用期限,一般均不超过两年。
临时建设和临时用地都对城市规划的实施产生重要的影响,因此,城市规划行政主管部门必须对城市规划区内的临时建设和临时用地进行严格的规划管理。任何单位和个人需要在城市规划区内临时使用土地或进行临时建设都应当征得城市规划行政主管部门的同意,不得影响城市规划的实施。
鉴于临时建设和临时用地的情况比较复杂,各地的管理体制和管理条件又不尽相同,因此,《城市规划法》第三十三条规定:“在城市规划区内进行临时建设,必须在批准的使用期限内拆除。临时建设和临时用地具体规划管理办法由省、自治区、直辖市人民政府制定。”
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条