说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 固井方案
1)  cementing plan
固井方案
2)  well completion project
完井方案
1.
Optimization of well completion project for the selectively perforated horizontal well;
水平井分段射孔完井方案优化
3)  collocation of wells
布井方案
1.
The correlation analysis calculate on the interferential wells, is strike up experiential equation of S=f(Q) and t=f(Q,d) go on the data on the pumping - out test, making time the can test and analysis in collocation of wells.
干扰井群相关分析计算,是依据实际抽水试验数据建立的S= f(Q) 及t=f(Q,d) 经验方程,进行布井方案的对比分析。
4)  drilling plan
钻井方案
1.
The optimization of branch numbers, branch angle and branch length and simulation drilling plan of fishbone-branch well are also researched in the paper.
面对大庆还没有开展鱼骨井钻井试验的现状,通过调研国内外鱼骨井钻井完井技术,结合大庆外围特低丰度薄差油层的地质特点,针对鱼骨井钻柱摩阻/扭矩预测、悬空侧钻、鱼骨井主井眼与分支井眼轨迹控制、鱼骨井主井眼完井管柱安全下入等四大技术难点,对分支井眼数量、分支井眼角度及分支井眼长度进行优化设计,开展鱼骨井模拟钻井工程设计及钻井方案研究,最终形成一套适应于大庆外围特低丰度油田薄差油层的鱼骨井钻井完井配套技术。
5)  reinforcement scheme
加固方案
1.
Finite element analysis of reinforcement scheme of Changsha dam and its safety evaluation;
长沙坝水库大坝加固方案有限元分析及安全评价
2.
Study on the reinforcement scheme of the slant-legged rigid frame arch bridge;
斜腿刚架拱桥加固方案研究
6)  reinforcement plan
加固方案
1.
The cause of the diseases has been found out through the present situation diagnosis,as well as with the theoretical analysis of the original design and the examination result,and the thinking of reinforcement design and the control factors,the four reinforcement plans have been studied,and the plan of a 7 cm integrat.
依据加固设计思路和控制因素,对4个加固方案进行分析研究,选定了7 cm整体化层+4 cm沥青铺装层不增加横隔板的加固方案。
2.
Through the utilization fuzzyoptimal theory, the fuzzy optimal models of bridge reinforcement plan with multi-layer and multi-objective are established, thus the relative optimal membership degrees of plans are got.
运用模糊优选理论,建立了桥梁加固方案的多层多目标模糊优选模型,并应用模糊定权的方法来确定目标的权重,得到各个方案的相对优属度,比较各个方案的优属度选择最优加固方案,并通过一个算例证明其可靠性。
补充资料:固井


固井
sealing of drop-shaft bottom to rock

  gUJ,ng固井(sealing of drop一shaft bottom to roek)在竖井沉井法掘进中将沉井井筒永久固定的技术。当沉井下沉达到设计深度后,为防止井筒继续下沉或出现位移,需采取加强井壁和土帮的固定措施,以隔离井筒与井外含水层的水力联系,这是沉井施工的最后一道工序。固井采取的主要措施是联接套井与沉井的上口,井筒壁后注浆以增加侧面阻力,砌筑沉井基座以增加正面阻力,最终使井筒保持稳固。 在固井之前,若刃脚坐落的基岩上面无隔水粘土层,则需构筑封底止水垫,以防止井内排水后,发生涌砂冒泥或突水事故。封底后,首先要清除套井与沉井之间的泥浆,然后在其中浇灌片石混凝土,同时将沉井上口的钢筋与套井锁口的钢筋焊接好,并浇灌混凝土,使沉井与套井连成整体。最后,排除井内积水,进行壁后注浆。一般采用分段下行、分段内上行式注浆方法。当采用泥浆护壁减阻时,要先注清水,把泥浆置换出来后,再注水泥浆。井底筑有止水垫时,要进行工作面预注浆。待浆液凝固后,破除封底止水垫,在基岩中砌筑沉井基座。待基座砌好,沉井施工结束,即转入井筒普通法掘进。 (石达民)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条