说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 复合施工方法
1)  Dual construction mode
复合施工方法
2)  construction method
施工方法
1.
A brief discussion on the characteristics and construction methods of the rigid suspension catenary in the urban rail;
简论城轨刚性悬挂接触网特点和施工方法
2.
On construction methods to treat soft soil roadbed;
处理软土地基路基的施工方法探讨
3.
Analysis on construction method of boring and expanding bottom pile in permafrost region in Qinghai-Tibet plateau;
青藏高原多年冻土区钻孔扩底桩施工方法浅析
3)  construction technology
施工方法
1.
Study on the Reasonable Construction Technology of Twin-bore Highway Tunnel;
连拱公路隧道的合理施工方法研究
2.
] A systematic summary and analysis of main construction technologies for metro in China were presented and the trend of construction technology for metro in .
本文对我国主要地铁施工方法进行了系统的综述和分析,并对我国今后城市地铁施工方法的主攻方向作了预估。
4)  construction [英][kən'strʌkʃn]  [美][kən'strʌkʃən]
施工方法
1.
Construction of Cast-in-situ Concrete Hollow Floor(GBF);
现浇混凝土空心楼盖(GBF管)的施工方法探讨
2.
Through the act of assessment, it is concluded that nitrogen replacement can increase the safety of pipeline replacement construction; pig isolation method is not the decisive method to decrease the air-mixed section of the pipeline.
并从注氮方案、注氮工艺参数、注氮总量、注氮安全措施等方面,重点介绍了安济天然气长输管道的注氮施工方法。
3.
The paper presents the construction method adopted for the construction of Longfeng tunnel on bid 2 section of approach line of Sui-Yu railway,which penetrates across underneath the existing Jianshanzi tunnel on Yu-he highway.
比较全面地介绍了遂渝铁路引入线第2标段龙凤隧道下穿渝合高速公路尖山子隧道的施工方法。
5)  construction methods
施工方法
1.
Discussion on the construction methods for joint connection in surface asphalt;
试述沥青面层接缝处理的施工方法
2.
The features, construction methods and .
文章简单介绍了该项技术的特点、施工方法、选井要求,并通过在现河油田高压低渗透油藏的矿场应用,录取到的资料详实可靠,为油藏开发动态调整提供了依据,解决了高压低渗透油藏注入剖面监测的难题,具有广阔的应用前景。
3.
It elaborates the plan on construction tied arch bridge by using cast-in-site with houseful support structure in special terrain,and simply introduces the construction methods,main points of support structure examines calculated with pointing out construction principles and important matters deserving attention in construction for the same type bridge.
对特殊地形建造系杆拱桥采用满堂支架现浇施工方案进行了阐述,并简单介绍了施工方法、支架检算要点,指出了该方案的施工原则以及注意事项,可供同类型桥梁施工参考。
6)  constructing methods
施工方法
1.
It makes simple introduction on earthwork studio as well as its application,analyzes the features of studio,and elaborates its constructing methods and its application in road construction,and points out the advantages of earthwork studio s application,so as to spread the application of earthwork studio.
就土工格室及其应用进行了简单介绍,分析了土工格室的特点,并简述了其施工方法,详细阐述了土工格室在公路建设中的应用,并指出了土工格室应用的优点,以推广土工格室的应用。
2.
Through introducing the basic digging methods and aiding constructing methods of tunnel,it compares and analyzes full-section method,double-side hole method,stiles method and central-partition method,chooses methods which suit large-span tunnel construction,makes reference for familiar construction.
公路的发展迫切需要大断面隧道,通过介绍隧道基本开挖方法和辅助施工方法,并对全断面法、双侧壁导坑法、台阶法和中隔墙法进行了分析比较,选择了适合大跨度隧道施工的方法,为大断面隧道施工提供了参考。
3.
Combined with experience in the past,it introduces the constructing methods of slanting stone arch bridge from aspects including basement process,basic construction,pier construction,arch support and arch circle construction.
结合以往的经验,从地基处理、基础施工、墩台施工、拱架、拱圈施工等多方面就斜交石拱桥的施工方法进行了详细介绍,并通过工程实例进行了说明,可供类似工程参考。
补充资料:施工


施工
construction

  shlgong施工(eonstruetion)核电厂建设过程中在工程现场所进行的包括前期工程、土建施工和设备安装在内的全部活动。分施工准备、组织施工和竣工验收三个阶段. 核电厂的建设坚持“安全第一,质量第一”的方针,并依据相关的大纲、程序进行管理。施工准备是保证工程项目具备开工和连续施工的基本条件‘组织施工是工程实施最重要的部分,必须认真做好质量、进度、投资三大控制和安全管理;竣工验收是检查验证完工的建筑物、构筑物及就位的设备、系统的质量、功能符合设计要求,竣工资料真实、完整。核电厂施工要严格按规章制度进行,做到凡事有章可循,凡事有据可查,凡事有人负责,凡事有人监怪。 施工准奋施工准备分为施工组织准备、施工技术准备、施工物资准备及施工现场准备. 施工组织准备工作涉及工程建设的三方,即业主、施工承包单位及监理单位,内容主要包括建立健全组织机构及进行工程管理规划设想.业主的施工管理机构为:施工经理领导下设土建施工、设备安装(核岛、常规岛及电厂辅助设施、电气)、施工支持(文件、测t、设备控制、金属质量、安全)等职能处室,由施工经理统一对外,要求人员精干,职贵明确,建立管理程序,严格按合同和程序办事,高效规范运作。施工单位应按合同规定建立施工组织机构,管理机构要高效精干,建立并实行一级质t保证、两级〔队(厂)与公司级〕质量控制制度,施工机构要与承担的任务相适应.建立、分析人力动员曲线,编写、出版管理程序和工作程序,开展管理及技能培训、工艺评定等。监理单位根据监理委托合同.建立项目监理部,总监理工程师及专业监理工程师应具备核电工程施工管理经验。 施工技术准备主要包括图纸文件及施工组织设计。业主应按合同规定及时将图纸文件交付施工单位,并确认可以使用。施工单位应认真阅读、理解,如有疑问之处,及时向业主提出澄清,由业主或设计单位做出答复。由承包单位编制并经业主(或委托监理单位)审查的施工组织设计是指导现场施工全过程的重要技术文件,其重点是施工方案、进度计划、人员及机具配备、施工平面布置及质量与安全措施.为此,应据此对现场进行统筹规划,科学组织,建立正常合理的施工程序,充分利用空间,争取时间,采用已经成熟的先进施工技术,并进行不利气候因素等风险分析.适当留有余度,以应付施工过程中的某些突发事件。对混凝土人模温度控制、大体积混凝土裂缝控制、反应堆弯顶整体吊装等重要施工方案进行专题分析、论证。 施工物资准备主要包括建筑安装材料、施工机具、永久设备三个方面。对开工必备的材料、机具要安排先期进场。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条