1) cooling pipe FEM model
水管冷却有限元法
1.
Some conclusions are obtained as follows:(1) As the distance between the node and the pipe increases,the relation of node temperature calculated by cooling pipe FEM model and cooling pipe equivalent model shows that former is smaller than the latter,then after,the former bigger than the latter,and the former is equal to the latter at the distance of 0.
通过对不同冷却时间以及不同绝热温升速率下两种不同水管冷却热传导计算模型计算的温度历程线进行对比分析,得到结论:①随着结点与水管距离的增加,水管冷却有限元法计算的结点温度与水管冷却等效热传导法计算的结点温度的关系为:先前者小于后者,然后前者大于后者,在距离水管为0。
2) cooling pipe element
冷却水管单元
3) temperature reduction scheme of cooling water pipelines
冷却水管降温法
4) The Finite Water-cooling Technique
有限穿水冷却工艺
5) cooling pipe
冷却水管
1.
Corrosion fallure analysis on centrul air conditioning cooling pipe;
中央空调冷却水管腐蚀开裂失效分析
2.
Application of cooling pipe in temperature control of large-size concrete construction;
冷却水管在大体积混凝土施工温控中的应用
3.
3-D Fem Simulation and Study on the Effect of Cooling Pipes and the Water Flowing upon the Dam for RCCD;
碾压混凝土重力坝采用冷却水管及坝面过水渡汛的三维有限元温控仿真分析
6) cooling water pipe
冷却水管
1.
A cooling water pipe of heating furnace cracked.
加热炉冷却水管发生断裂,通过对其化学成分,显微组织,晶粒度,断口等进行检验分析,认为冷却水管断裂主要是因为水管局部长时间高温氧化腐蚀造成的。
2.
In this paper, an analysis of cooling water pipe damage at low part of shaft and belly in No 7 BF is introduced and the suggestions for improvement are pointed out in 199
分析了1998年鞍钢7号高炉炉腰和炉身下部冷却水管破损原因,指出应注意改进的方向。
3.
The paper studies the construction method of mass concrete named "embedding cooling water pipe".
对采用“预设冷却水管”法进行大体积砼施工的方法进行了试验研究,并在具体工程中得到了应用,效果良好。
补充资料:钢筋混凝土循环水管施工
钢筋混凝土循环水管施工
reinforced concrete circulating water pipe construction
gongjln hunn一ngtu xunhuanshu一guan sh一gong钢筋混凝i循环水管施工(reinforced con-erete eireulating water pipe eonstruetion)有现浇和预制两种施工方法。现浇管在挖沟完后,在沟内分段浇筑。预制预应力管在工厂制作,再运到现场敷设。预制管工厂的设备比较简单,如工程地点离工厂较远而该种管子数t多时可将设备搬到现场制造。管子的直径可达3m甚至更大,长度一般为4m。 预制预应力钢筋棍凝土管预制,可用一阶段(展动挤压)工艺或三阶段(管芯绕丝)工艺施工。一阶段工艺系用申立式成型,用加工精密的内外钢套模组合定型,将主钢筋张拉完成后,即浇筑混凝土一次成型,经静定时间后蒸汽养护.三阶段工艺系按上法先浇制混凝土管芯,成型后再在管芯上缠绕预应力钢丝,用机械或电热法张拉,然后再喷盖水泥砂浆保护层,以防钢丝生锈,经水压试验合格后出厂使用。 数设带承插口的钢筋混凝土预制管挖沟徽设.平口对接的钥筋混凝土预制管除挖沟徽设外,还可采用顶管施工(见取水构筑物施工)。挖沟后按设计规定在沟底铺一层黄沙或石子,再用起重机械将预制管逐节吊人沟内、找正位!,在插口上套上橡胶密封圈后,往前一节的承口方向水平加力拉紧,使插口和橡胶圈同时均匀地嵌人承插口内,按此步探依次进行下一节管的安装.橡胶圈本身的直径略大于承插口间尺寸,并有规定的压缩比及防老化剂。在承擂口内侧采用钢衬圈和密封环进行环向水压试验.水压试验的标准按设计和规范要求。安装后进行回坟土,要求在两侧均匀回填分层夯实。 预应力钢筋混凝土管自重较大,在软土地区使用时要做混凝土基础。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条