1) cooling wastewater in coke tower
焦炭塔吹气冷却废水
1.
The active conversion agent,high-effect dispersant and coagulant Ⅱ were used to treat cooling wastewater in coke tower in delayed coking unit.
采用活性转化剂、高效分散剂、聚凝剂Ⅱ等三种药剂处理延迟焦化装置焦炭塔吹气冷却废水。
2) coke cooling chamber
焦炭冷却室
3) cooler exhaus gas
冷却废气
1.
Using cooler exhaus gas as hot air souce,the hot air sintering test under Meishan mix conditions was conducted' The influence of hot air temperature and hot air action time and fuel rate on sinter quality and quantity indices were studied.
本文利用烧结矿冷却废气为热源,进行了梅山烧结料热凤烧结试验。
5) cooling tower
冷却水塔
1.
1 cooling tower, analyzes the reasons of engendering the problems, puts forward feasible treatment measures.
对#1冷却水塔运行中出现的问题进行了阐述,分析了产生这些问题的原因,并提出了切实可行的处理措施。
补充资料:保险商实验室安全标准(见保险商实验室)
保险商实验室安全标准(见保险商实验室)
safety standards of UL: see Underwriters Laboratories; UL
Baoxianshang Sh啊nshi anquan bicozhun保险商实验室安全标准(saJ七ty stand助dsofUL)见保险商实脸室。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条