说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 设计和施工特点
1)  design and construction characteristics
设计和施工特点
2)  the supervision points
设计和施工监理要点
3)  design and construction
设计和施工
1.
Combined with upgrading and expansion engineering of sewage treatment plant in northern suburbs the structural design and construction of extra caisson of pumping station is introduced.
结合太原市北郊污水处理厂工程,探讨了污水提升泵房沉井结构设计和施工的一般步骤,同时提出了设计施工注意事项,对地下建筑物的结构设计和施工具有一定的参考意义。
2.
Througb design calculating and observing about foundation subside on water over-saturated silt clay ground, achievements in strip foundation design and construction on water oversaturated silt clay ground are summarized.
通过对过饱和水淤泥质粘性土地基上基础沉降的设计计算及观测研究,总结出过饱和水淤泥质粘性土上条形基础设计和施工方面的研究成果。
3.
Presently the design and construction level of long-span bridges of our country is being upgraded constantly.
我国由于大跨径悬索桥起步较晚,在主缆除湿系统的设计和施工方面尚未有系统的研究。
4)  design and construction process
设计和施工工艺
5)  design and construction outline
设计与施工要点
6)  the essential of design and construction
设计施工要点
补充资料:模具设计要点
1.一般平板成品不宜中间进胶﹐以防弯曲变形。
2.一仍般情况下STP在RP正下方。
3.当模座较大时﹐STP的间隔为150--200mm。
4.锁上下顶出板的螺丝间隔为150--200mm。
5.当有顶针在滑块下方或斜梢有靠破时﹐上下顶出板要装有强制回位机构。
6.成品拔模斜度以减胶为基准。
7.设计水路时﹐尽量不要采用水管直接接入模仁﹐而改用模进水管用"O"RING联接模仁。
8.SP尽量将其直径取大并布置在成品的正投影面积下方。
9.冷却水路三原则﹕A.快速冷却﹐ B.均匀模温﹐ C.加工方便。
10.斜梢距模具中心应取整。
11.KO孔随注口衬套的偏心而偏心﹐且注口衬套的最大倾斜角度不得大于15%%d。
12.对于二片半模﹐上固定板与母模板之间的分模行程要用机构加以控制﹐LP在公模板上必需要有注导衬套﹐一般还需要有LK开闭器。
13.处理内侧倒钩的方法一般可用斜梢﹐内侧滑块﹐剥脱板(顶出中板)﹐顶出梢应尽量避免在滑块底下﹐以免发生碰撞或干涉。
14.一般模仁超出成品轮廓20--30mm,且距
模具中心应取整﹐模板距模仁边框20--30mm,
若有滑块应考卢将模板加大﹐特别注意避免
和回位梢干涉。
15.支撑柱(SP)的摆放与脚垫间距应量保
持相等﹐使其模具保持平衡。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条