1) load holding duration
持荷时间
1.
The model tests for the very long prestressing strands of Yeshan River Bridge on the West Section of Shanghai-Chengdu Expressway were made,the initial tensile force and load holding duration of the strands were studied and the research findings of the initial tensile force and load holding duration of the same type of the strands of several other bridges were provided.
以沪蓉西高速公路野山河大桥的超长预应力束为研究对象,进行模型试验,研究超长预应力束的初张力及张拉持荷时间,并提供了其他几座桥梁的超长预应力束初张力及持荷时间的研究成果。
2) keeping time of gross load
总负荷保持时间
3) duration of load
负荷保持时间
4) submaximal exercise
定量负荷运动持续时间
1.
They were asked to perform 5×10min submaximal exercise bouts(with intensities of 25%、40%、55%、70%、85%VO2max) and a supramaximal exercise bout on bicycle at 120% of VO2max for 132.
目的:探讨采用不同定量负荷运动持续时间对推算最大累积氧亏(MAOD)的影响。
5) duration of peaking time
尖峰负荷持续时间
6) load duration curve
负载持续时间曲线;负荷持续曲线
补充资料:黏性保持时间
分子式:
CAS号:
性质:未硫化混炼胶表面涂刷胶黏剂后,会呈现出黏着性,但随着溶剂的挥发,表面逐渐失去黏性,从涂刷开始到失去黏性的时间称为黏性保持时间。混炼胶黏性保持时间的长短取决于胶种和增黏剂的品种和用量。黏性保持时间越长,越有利于成型加工艺操作。
CAS号:
性质:未硫化混炼胶表面涂刷胶黏剂后,会呈现出黏着性,但随着溶剂的挥发,表面逐渐失去黏性,从涂刷开始到失去黏性的时间称为黏性保持时间。混炼胶黏性保持时间的长短取决于胶种和增黏剂的品种和用量。黏性保持时间越长,越有利于成型加工艺操作。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条