说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预留土台
1)  remaining berm
预留土台
1.
1 tendering section by use of the top-down construction method,the deformation rules of underground diaphragm walls under three different longitudinal excavation widths of the remaining berm and with or without inclined bracing setting are compared through centrifuge model tests.
以上海世博会世博轴及地下综合体工程1标段逆作法施工深大基坑为背景,通过离心模型试验对比研究了3种不同的预留土台纵向开挖宽度及有无斜抛撑情况下连续墙的变形规律;在此基础上,结合"时空效应"理论进行了数值计算分析,研究了斜抛撑对围护结构变形的控制作用。
2)  performed core-soil sidesteps
预留核心土台阶法
3)  bench reservation core soil
正台阶预留核心土法
1.
By comparison and selection of Laoshan Tunnel of Ninghuai Expressway, this paper put emphasis on the application of bench reservation core soil in the Laoshan Tunnel.
本文介绍了老山隧道采用正台阶预留核心土法圆满完成大断面软弱围岩段施工,取得了良好的经济效益和社会效益,可供类似性质工程借鉴。
4)  three-step core-soil method
三台阶预留核心土法
1.
According to the geographic situation of the construction,the paper integrates the consideration on the safety,the quality,the process and the costs,adopts the three-step core-soil method to excavate and support by combining the temporary inverted arch and the fan support,and also gives an introduction on the construction points.
根据工程的地质情况,综合安全、质量、进度、成本各方面因素考虑,采用了三台阶预留核心土法联合临时仰拱、扇形支撑进行开挖支护,对其施工技术要点作了叙述,通过施工效果评价,表明该施工方法是科学合理、安全有效的。
5)  remaining soils
预留土体
6)  provided mud dyke
预留土堤
1.
Study and application of provided mud dyke in deep excavation;
深基坑开挖预留土堤理论研究及工程应用
补充资料:法性属法为法性土
【法性属法为法性土】
  谓真如法性之理,譬如虚空,遍一切处,乃是法身所证之体,即为所依之土,故名法性属法,为法性土。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条