1) receiving pit
接收坑
1.
The pipe driving construction method characteristics,pipe material choice,pipe driving force calculation and apex distance determination,working pit and receiving pit selection and size determination were analyzed.
对顶管施工方法工艺的特点、管材选择、顶力计算和顶距确定、工作坑和接收坑选用及尺寸确定等方面进行了分析,并提出了顶管法施工应注意的一些事项,以推广顶管技术的应用。
2) timber recovery
回收坑木
3) shrinkage depression
收缩凹坑
4) collecting sump
集水坑;收集坑
5) collection sump
集水坑,收集坑
6) grounding hole
接地坑
补充资料:接收
①收受:~来稿 ㄧ~无线电信号。②根据法令把机构、财产等拿过来:~逆产。③接纳:~新会员。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条