1) pipe driving construction method
顶管施工方法
1.
The pipe driving construction method characteristics,pipe material choice,pipe driving force calculation and apex distance determination,working pit and receiving pit selection and size determination were analyzed.
对顶管施工方法工艺的特点、管材选择、顶力计算和顶距确定、工作坑和接收坑选用及尺寸确定等方面进行了分析,并提出了顶管法施工应注意的一些事项,以推广顶管技术的应用。
2) push bench construction process
顶管施工法
1.
Application of the push bench construction process in the culvert construction;
顶管施工法在涵洞施工中的应用
3) Tunnelling by pipe jaching
顶管法施工
4) jacking construction
顶管施工
1.
The jacking construction steps of polluted water main tube net project of Sanxiang town Zhongshan city;
中山市三乡镇污水主干管网工程顶管施工措施
2.
In the combination with project example the paper states the destruction phenomenon of roads along lines due to the jacking construction of urban sewers.
结合工程实例,阐述由于城市污水管道的顶管施工导致沿线道路产生的破坏现象,分析了破坏的原因,提出了具体的处理方法并总结经验教训。
5) pipe-jacking construction
顶管施工
1.
In the construction of inverted siphon project of Puxian Bridge,due to the complex geological conditions of the site and being affected by permeation of surface water and ground water,the sinking well and pipe-jacking construction has serious hidden dangers in the construction,which prevent the construction from going on.
普贤桥倒虹吸管工程施工中,由于场地地质条件复杂,受到地表水与地下水的渗透影响,沉井顶管施工存在严重施工隐患问题,无法继续施工,通过采用高压喷射注浆法技术措施处理后,沉井顶管施工安全顺利完成,取得成功经验。
2.
Slump failure happened in Luolong Rd-through pipe-jacking construction for sewersof Guanlin Avenue asthe soil isof sandy gravel.
关林大道污水管道顶管施工穿越洛龙路,土层为砂砾石,管顶及周围出现坍塌现象,为防止洛龙路路基下沉,沿污水管位置钻孔,采用回填注浆处理。
3.
According to site monitoring and test results, the mechanism and behaviour of soil deformation induced by large-scale pipe-jacking construction are analyzed and a significant mechanism theory is presented.
根据现场监测和试验结果,对大型顶管施工产生的周围土体扰动变形的机理和特性进行了分析研究,提出了对工程有指导意义的扰动机理理论;同时,考虑扰动区土体密实度变化的影响,对Peck的地表沉降理论计算公式进行了修正,修正的Peck理论公式的计算结果与实测结果更为一致。
6) pipe jacking
顶管施工
1.
The application of bentonite in pipe jacking works;
膨润土在顶管施工中的应用
2.
The technique of pipe jacking has been widely applied to water supply and drainage projects on the lower reaches of the Yangtze River; however, the integrality, stability and safety of the Yangtze levee are threatened by the disturbance to the foundation soil.
长江下游岸边取排水工程大多采用顶管施工工艺穿越长江大堤,顶管施工对地基土的强烈扰动严重威胁大堤的完整性、稳定性和安全性。
3.
This paper analyzes the deviation in pipe jacking practice,with the D N1 500 mm concrete pipe jacking as an example,which lies to the east of the historic Yellow River channel in Xuzhou.
对排水混凝土管道顶管施工中出现的偏差进行了分析 ,阐述了不出现较大偏差时应采取的挖土、顶进和检测方法 ,并提出了一种挖土校正中线偏差的方
补充资料:顶管
顶管
pipe jacking
d ingguon顶管(pipe jaeking)将需埋设的地下管道在工作坑内直接顶入土层中的暗挖式施工方法。可用于工技术的发展。美国在不用中继接力环的情况下顶进在软土地区施工地下管道穿越铁路、公路、湖泊河流及距离达到588m,德国在使用中继接力环的情况下创造建筑物等。顶管按顶进方向木同分为水平顶进和垂直出1210m的长距离顶管记录。上海宝山钢铁总厂3条顶进;按挖土方式不同,分为机械开挖顶进,挤压顶进,直径为3m、长约180m的进水钢管管道采用泥浆套顶水力机械开挖顶进和人工开挖顶进;按顶进长度分为管法施工。1986年上海顶进穿越黄浦江的煤气管道的一般顶管和长距离顶管。一般顶管的顶进距离通常不直径为2.4m、总长694m,是当时国内顶进距离最长超过10om,适用于城市排水工程施工。长距离顶管的的顶管工程。1981年英国研制出蛆叫式顶管新技术,顶进距离长达数百米甚至上千米,一般用于穿越江、日本将遥控技术应用到顶管法中,通过闭路电视和各河、湖、海底部的工程施工。长距离顶管常以中继接力种仪表进行遥控操作。由于顶管施工技术的不断发展,分段顶进。顶管常用的为钢筋混凝土管和钢管。根据工歉,2洲··\一.,:下巍1尸户沪作坑(井)尺寸和起吊设备能毅二qZJ///艺__瘾葵壑蘸夔痊些夔蝗蛋夔邑百命场尹毯尼丝生自魏酬力确定每节管子长度。钢管未可朽趋蓦酬用日翻蕉鑫囊童奎鑫:奎奏羹奎鑫颤冒认燕刃荀套萄襄羹羹葬接头通常在工作坑(井)内焊戮羚鸳到玛粼泳绎二鸯毖本鬓与蛾当祥车J公堤接。钢筋混凝土管接头一般L汾之汾勒瓜晶狱淤.一;汰二‘;公二‘磷漏习采用带有钢外套环的平接式,外套环可以固定在管的顶管施工示意图一端,也可以不固定。接头采1一后座;2一调整垫;3一后座支架;4一千斤顶支架;5一主千斤顶;6一刚性顶铁;7一u形用环形防水密封圈形式。顶顶铁;8一环形顶铁.9一导轨;1。一预埋板;11一管道;12一穿墙止水;13工作井井壁。14-管法施工设备有顶进设备密封圈;巧一中继环;16一中继千斤顶;17一工具管(如千斤顶、后座、顶铁和导轨等)、出土设备(根据挖土方式而定,如吸泥机、切又出现了许多特种顶管方法,例如平列式顶管、垂直顶削盘等)和其他设备(如中继接力环、泥浆配制供给设管,大型箱涵顶进等。备等)。参考书目 顶管施工前开挖工作坑‘井),并在工作坑内做后.、,_矜更牛产大同编,软土地基与地下工程,中国建筑工业__二__.二_‘__乙一_一万、_‘_一_一‘、二丁厂.’’.几一丁’~二一出版社,北京,1984。座(后背)和安设导向设施。工作坑是进行卸管、接管、一‘一’一‘一‘”----一__、二、。二瓜、,二二一;’二一:三几_:三二一二二几二丫二介.1、’(仰正国)安设顶进设备和出土等的工作场所。管节卸入工作坑’‘’-一‘后,通过传力顶铁和导向轨道,用支承在基坑后座上的液压千斤顶将管节顶入土层中,同时在管内取土。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。