说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 长期堆载预压
1)  long term preloading
长期堆载预压
1.
The application of long term preloading method in highway soft soil foundation treatment
长期堆载预压在公路软土地基处理中的应用
2)  preloading
堆载预压
1.
Analysis of consolidation effects of Zhoushan National Oil Reserve Base improved by preloading combined with plastic drains;
舟山国家石油储备基地堆载预压加固效果分析
2.
Calculation methods of foundation stability in process of preloading;
堆载预压过程中的地基稳定性计算方法
3.
The whole course in the preloading treatment of a soft clay foundation was introduced.
介绍了某软土地基在堆载预压处理中进行全程工程监测,通过对堆载预压区超孔隙水压力的消散度、沉降速率、水平位移速率、分层沉降速率、地下水位等的监测,适时地指导了堆载预压区施工的时机、施工方案和施工段落的选择,避免了盲目施工,确保施工安全和工程质量。
3)  pre-loading
堆载预压
1.
The application of vacuumization plus pre-loading to the treatment of soft ground on Hangzhou-Ningbo expressway;
真空联合堆载预压在杭宁高速公路软基处理中的应用
4)  preloading method
堆载预压
1.
Application of Biot s consolidation theory to improving soft ground by preloading method;
比奥固结理论在堆载预压加固工程场地中运用
2.
Application of preloading method to soft foundation treatment is discussed.
介绍了堆载预压法在某港口工程深厚软基处理中的应用,工程采用了梯形法堆载,从设计方面优化了堆载形式及方法,并进行了施工监测,制定堆载速率的控制指标,可由监测数据科学合理、信息化地指导施工。
3.
On the base of certain project using preloading method to settle its soft foundation in Shanghai, the stability of different loading methods is analyzed in this paper.
结合上海某工程堆载预压方案对不同堆载方法稳定性进行了分析。
5)  surcharge preloading
堆载预压
1.
Experimental study on effect of treatment of soft foundation with vacuum-surcharge preloading;
真空堆载预压处理软基效果的室内试验研究
2.
Research on plastic drainage plate surcharge preloading in treatment of highway's soft foundation
塑料排水板堆载预压处理高速公路软基的研究
3.
Considering the special engineering geology condition of soft soil foundation in Qingdao seashore expressway,vacuum preloading、surcharge preloading、vacuum combined surcharge preloading and dynamic compacted stone pier are adopted to strengthening soft soil foundation.
针对青岛滨海公路施工现场特殊的工程地质条件,分别采用真空预压、堆载预压、真空联合堆载预压、强夯片石墩等软基加固法加固软土地基。
6)  surcharge preloading
堆载预压法
1.
According to the practical soft foundation treatment project of Hexi Development Zone in Nanjing,reinforcement mechanisms of surcharge preloading and vacuum preloading are analyzed.
结合南京市河西开发区中软土地基处理的实际工程,分析了堆载预压法和真空预压法的加固机制,比较了二者在施工工艺和加固效果上的异同,为合理的选择不同的软基处理方式提供了科学的依据。
补充资料:预压法
      对软土地基预先加压,使大部分沉降在预压过程中完成,相应地提高了地基强度。预压法适用于淤泥质粘土、淤泥与人工冲填土等软弱地基。预压的方法有堆载预压和真空预压两种。
  
  堆载预压  在地基上堆放重物(水、土、砂、石等)进行预压。当堆载超过计划建造的建筑物荷载时,称为超载预压。为了防止堆载时压坏地基,需分级加载,即:在前一级荷载作用下地基基本固结后,再施加下一级荷载,直至达到设计荷载为止。
  
  预压所需时间的长短取决于地基土层的渗透特性、厚度和预压荷载的大小等因素。这些因素可以根据地基固结理论进行计算预计。施工时应监测地面沉降和土中孔隙水压力的消散情况,对预压加以控制。
  
  为了加速厚层软土的固结,缩短预压时间,应设法改善厚层软土的排水条件。最常用的排水的方法是在地基中按一定间距作孔,孔内填砂以形成砂井(图1)。然后在地面加铺砂垫层加以沟通。近年来,土工织物日益发展,已开始采用纤维编织的袋装砂井和在排水纸板上发展起来的塑料板排水。
  
  
  堆载预压早在50年代就广泛地应用于铁路、公路路堤、码头和岸坡的地基处理;还应用于土坝、水闸、房屋、冷藏库和油罐等工程的软基处理。如中国的苏北大浦和汉江杜家台两个大型水闸工程,经过预压后,大大减少了闸室和岸墩的沉降量;又如上海地区采用3万米3油罐充水预压改良地基,取得了显著效果。
  
  真空预压  以大气压作为预压荷载(图2),对地基土进行抽气,在土中造成一定的真空度,形成大气压力与真空压力的差值作用,将土中一部分水抽出,从而使地基土固结而加固。如果设置排水砂井,还可将孔隙内的水加速排出。
  
  
  此法首先由瑞典皇家地质学院于1952年提出。到80年代,中国也进行了室内外试验,并且已经开始在工程中应用。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条