说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 核心筒结构
1)  the core tube structure
核心筒结构
1.
According to the concrete project example,this article has carried on the multianalysis using AutoCAD and the Excel computer technology to the core tube structure raft board foundation place job practice.
根据具体工程实例,运用AutoCAD和Excel计算机技术对核心筒结构筏板基础处的施工方法进行详细地分析和论证。
2)  frame-core wall structure
框架-核心筒结构
1.
Design of shear-wall coupling beams in frame-core wall structure
框架-核心筒结构剪力墙连梁设计
2.
Based on the characteristics of a frame-core wall structure and the main differences between a frame-core wall structure and a frame-shear wall structure under horizontal force,the structure system judgment is discussed about the tall buildings with a core shear-wall in the central part of a plane,and a distinguishable method is presented about how to judge this type of structure.
基于框架-核心筒结构的空间受力特点和框架-核心筒与框剪结构在水平力作用下的主要区别,讨论了平面中部带剪力墙核心筒的高层建筑结构体系定义问题,给出该类结构定义为框架-核心筒结构或框剪结构的区分方法,文中所列举的结构体系判定实例可为类似结构设计提供参考。
3.
A method of sidesway controlling by horizontal loads on high-rise frame-core wall structures was discussed and mechanism of reducing structure sidesway with horizontal outrigger and belt elements had been analyzed.
探讨了高层框架-核心筒结构在水平荷载作用下的侧移控制方法,分析了设置水平伸臂构件和环带构件对减小这类结构侧移的作用机理。
3)  frame-corewall structure
框架-核心筒结构
1.
The structural system is RC frame-corewall structure and SRC column is used from floor 1 to floor 24.
武汉开顿国际大厦建筑面积84568m~2,总高度205m,地下2层,地上48层,采用钢筋混凝土框架-核心筒结构,其中层1~24框架柱为型钢混凝土柱。
4)  frame-tube structure
框架-核心筒结构
1.
Seismic effect of frame-tube structure with strengthened story and three different seismic energy-dissipation stories is analyzed.
本文分析了加强层和3种不同耗能减震层对框架-核心筒结构的减震效果,以顶点位移为目标对单个粘滞耗能减震层的最佳布置位置进行了研究,并分析了粘滞环带耗能构件对结构性能的影响。
2.
The frame-tube structure is used ever more extensively in modern high-rise buildings with the increase of structure height, and the structure configuration is also becoming more and more complex for the diversity of building function.
近年来框架-核心筒结构在高层建筑中广泛应用,并且由于建筑功能的多样化使得结构体型越来越复杂,因此这就对复杂高层建筑结构分析和设计提出了新的要求。
3.
With the rapid development of tall buildings, frame-tube structureswith a strengthened layer have been in more and more use in practicalengineering.
随着高层建筑的迅猛发展,带加强层框架-核心筒结构体系在实际工程中得到了越来越多的应用。
5)  frame-core structure
框架-核心筒结构
1.
It is stipulated in Code for Seismic Design of Building(GB50011-2001) that the ratio of overturning moment subjected to the core wall to the overall overturning moment of the structure due to earthquake should be more than 50 percent in the reinforced concrete frame-core structures.
我国现行建筑抗震设计规范(GB50011-2001)规定,钢筋混凝土框架-核心筒结构中核心筒承受的水平地震作用倾覆力矩与总倾覆力矩之比应大50%。
6)  core tube supported structure
核心筒悬挂结构
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条