1) weak interconnect system
弱互联系统
1.
It\'s analyzed by a time-domain simulation using EUROSTAG and validated the importance of the inertia in weak interconnect systems in IEEE-39.
系统惯量越大,系统相对角变化速度越慢,在大区弱互联系统中,送端系统与受端系统间相对角变化速度不一致。
3) interconnected systems
互联系统
1.
Robust control based on interconnected systems;
基于互联系统的鲁棒控制
2.
Decentralized hybrid adaptive intelligent control of nonlinear interconnected systems;
非线性互联系统的分散混合自适应智能控制
3.
Rational assessment of spinning reserve in interconnected systems is useful to improve economic benefits and operating reliability.
综述了针对不同运行条件下确定互联系统旋转备用容量的方法,比较了方法的优缺点,指出了与容量确定相关的考虑因素。
4) interconnected system
互联系统
1.
This approach is demonstrated feasible and efficient in practical problem to evaluate the risk level of interconnected systems.
基于传统的发电系统停运模型理论,在考虑系统运行备用容量、联络线输电容量限额及联络线强迫停运率的条件下,提出容量支援法用于快速有效地定量评估互联系统的风险水平,以考察两互联系统间运行备用的联网效益。
6) interconnected large-scale system
互联大系统
1.
Research on an interconnected large-scale system based on optimal guaranteed cost control;
基于最优保性能控制的互联大系统实例研究
补充资料:北欧各国电力系统互联
北欧各国电力系统互联
interconnection of elec-tric power systems in north Europe
be一ou ge guod一onl.x一tong hul旧n北欧各国电力系统互联(interconneetion ofelectrie power systems in north EuroPe)丹麦、芬兰、冰岛、娜威、瑞典等北欧国家的电力系统通过联络线相互连接.实现电能的交换. 电力系统的现状北欧电力联合组织(NordicOrgani:ation for Eleetrie Power Cooperation,NORDEL)建立于1963年,由丹麦、芬兰、冰岛、娜威和瑞典5国组成。全电力系统及各国1997年的电力概况如表1所示。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条