2) Goupitai Hydropower Station
构皮滩水电站
1.
Application of Moderate-heat Portland Cement with Rich MgO & C_4AF in Dam Concrete of Goupitai Hydropower Station;
高含MgO,C_4 AF中热硅酸盐水泥在构皮滩水电站拱坝混凝土中的应用
2.
Bodily Form Optimum for Bottom Branch Pipe in Tail Water Surge Chamber of Goupitai Hydropower Station;
构皮滩水电站尾水调压室底部岔管体型优化
3.
Emulation Research on Construction of Dam Concrete of Goupitai Hydropower Station;
构皮滩水电站大坝混凝土施工仿真研究
3) Goupitan hydropower station
构皮滩水电站
1.
Concrete placing construction for water cushion pool of Goupitan hydropower station;
构皮滩水电站水垫塘抗冲耐磨混凝土浇筑施工
2.
Development & Application of Rotary Orifice Lute in Seepage Control Engineering of Goupitan Hydropower Station;
旋转式孔口封闭器在构皮滩水电站渗控工程中的开发与应用
3.
Study on Construction Process of Concrete with Erosion & Tear Resistance Characteristics for Spillway Tunnel of Goupitan Hydropower Station;
构皮滩水电站泄洪洞抗冲耐磨混凝土施工工艺探索
4) Goupitan hydroelectric plant
构皮滩电站
1.
Though the range of water head is not too wide,maximum efficiency of Goupitan hydroelectric plant is very high and weighted efficiency focus on rated head wide range in flow.
尽管构皮滩电站的水头变幅并不大,但最高效率要求较高,而且设计水头附近横向权值大。
5) goupitan reservoir
构皮滩水库
6) construction diversion of Guopitan Hydropower Station
构皮滩水电站施工导流
补充资料:黄龙滩水电站
黄龙滩水电站 |
Huanglongtan Hydropower Station |
概 述 |
黄龙滩水电站位于中国湖北省郧县、汉江支流堵河上,距十堰市60km。坝址以上流域面积11140km2,多年平均流量194m3/s。大坝按100年一遇洪水13300m3/s设计,500年一遇洪水16600m3/s校核。正常蓄水位247m,总库容11.625亿m3,兴利库容5.985亿m3,死库容4.14亿m3,调洪库容1.5亿m3。淹没耕地424.2hm2,迁移人口13991人。坝址基岩为变质结晶片岩,地震基本烈度6度。混凝土重力坝坝顶高程252m,最大坝高107m,坝顶长371m,坝顶宽20m,体积98万m3。溢流段堰顶高程227m,装有6扇12m×10m平板闸门,最大泄量11200m3/s。堰顶单宽流量156m3/s,采用挑流消能,大坝右部设1孔非常溢洪道,堰顶高程238m,净宽10m,最大泄量1030m3/s。大坝左部设泄洪底孔1孔,孔口尺寸5m×6m,进口底部高程197m,最大泄量830m3/s。左岸岸边引水式厂房,用2条直径6.5m的压力钢管引水。厂房内装有2台HL009-LJ-410型水轮机,单机容量7.5万kW,转数150r/min,引用流量123m3/s,设计水头58m。总装机容量15万kW,保证出力5.3万kW,多年平均发电量7.59亿kW·h。工程主要任务是发电,灌溉面积仅333hm2。施工导流时采用土石过水围堰,堰高12.5m,用7.5m×9.5m×1.0m混凝土板护面,最大过堰流量为6570m3/s,单宽流量55m3/s,1969年4月开工,1978年10月竣工。 |