1) rock plug intake
岩塞进水口
1.
Grouting test at the rock plug intake and solutions for main problems in reconstruction of Changdian hydropower station
长甸电站改造工程岩塞进水口现场灌浆试验和主要问题及处理
2) gas inlet plug
进气口塞
3) removing inlet rock bank blocking water
进水口挡水岩坎拆除
1.
This kind method of blowing up was used in removing inlet rock bank blocking water in Wujiangdu power plant s extension project,and made good results in dispelling impacts of vibration from blasting a.
这种爆破方法在乌江渡发电厂扩建工程进水口挡水岩坎拆除中得以应用,在消除爆破震动和飞石对引水塔、大坝及爆区周围环境的影响方面取得了良好的效果,也为今后在页岩地质条件下的施工提供了较好的经验。
4) nozzle clogging
水口堵塞
1.
Simulation of Liquid Level Oscillation and Flowage in Slab Concasting Mold during Submerged Nozzle Clogging Course;
浸入式水口堵塞过程板坯结晶器内流动与液面波动的模拟
2.
Analysis on steel overflow by nozzle clogging and the precautions for ASP caster;
ASP连铸机水口堵塞造成的结晶器溢钢事故分析及预防
3.
The paper analyzes the cause to ladle nozzle clogging in casting CAS-OB treated non-Al-killed liquid steel and solved the problem of the nozzle clogging by improve CAS-OB process.
本文针对CAS-OB精炼炉处理的非Al镇定钢,在连铸浇铸过程中发生钢包水口堵塞原因进行分析,通过优化CAS-OB操作工艺,解决了钢包水口堵塞问题。
5) nozzle blockage
水口阻塞
6) IFB (inlet flow blockage)
进口流阻塞
补充资料:挡口
1.犹时候。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条