1) concrete lifting
混凝土顶升
1.
According to the engineering practice of Zhaojiagou Bridge in Pudong North Road, the article sets forth in detail the construction control of the concrete lifting for the steel-pipe concrete bowstring arched bridge able to provide the reference for the relative construction members.
该文结合浦东北路赵家沟大桥的工程实际,详细阐述了钢管混凝土系杆拱桥混凝土顶升的施工控制,可供相关施工人员参考。
2) pumping-up concrete
泵送顶升混凝土
1.
Engineers apply permanent rectangular-steel-box formwork and the construction technique of pumping-up concrete to solve the construction difficulties.
本文总结了钢筋混凝土柱泵送顶升混凝土的过程,为今后类似工程提供可借鉴的施工方法。
3) process of hoisting concrete
混凝土顶升过程
4) concrete pipe-jacking
混凝土顶管
1.
For concrete pipe-jacking, there are no special design codes,so water supply and draniage code experience are used in design.
混凝土顶管设计没有专门的设计规范,在设计中大多结合给水排水规范和工程类比经验。
5) concrete umberlla arch
混凝土顶拱
6) concrete ceiling
混凝土顶棚
补充资料:送张升卿宰新滏
【诗文】:
官柳叶尚小,长安春未浓。送君浔阳宰,把酒青门钟。
水驿楚云冷,山城江树重。遥知南湖上,只对香炉峰。
【注释】:
【出处】:
全唐诗:卷200_51
官柳叶尚小,长安春未浓。送君浔阳宰,把酒青门钟。
水驿楚云冷,山城江树重。遥知南湖上,只对香炉峰。
【注释】:
【出处】:
全唐诗:卷200_51
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条