1) CPR1000 nuclear power station
CPR1000核电站
1.
Truncated cone raft foundation for CPR1000 nuclear power station reactor workshop belongs to typical massive concrete foundation,of which temperature crack control for A and B layers is difficult,so the integral pouring construction technology is applied.
CPR1000核电站反应堆厂房基础为圆台筏板基础,属于典型大体积混凝土。
2) NI (nuclear island)
核岛,核电站
3) Nuclear power station
核电站
1.
Welding procedure evaluation in nuclear power station construction and quality control of welding examination;
核电站焊接工艺评定与焊工考试质量控制
2.
The managing way discussion about the radiation environmental effect of the Canadian nuclear power station;
加拿大核电站辐射环境影响管理方法探讨
3.
Performance properly and application of paint for corrosion protection of steel structure in containment of nuclear power station;
核电站安全壳内钢结构——防护涂料的性能与应用
4) Nuclear Power Plant
核电站
1.
Analysis of design improvement on radiation monitoring system A operation condition of nuclear power plant;
从某核电站运行情况分析今后辐射监测系统设计的改进
2.
Control rod drop time analysis for the nuclear power plant under action of strong earthquake;
强地震作用下核电站控制棒下落时间分析
3.
Ventilating measures of the fuel assembly line in nuclear power plants;
核电站燃料组件生产线通风措施
5) PWR nuclear power plant
PWR核电站
1.
The paper reports the model of the reactor core of the PWR nuclear power plant and established the suitable core physics mathematics model for microcomputer simulation.
阐述了 PWR核电站堆芯的模型化问题 ,提出了适用于微机仿真的核电站堆芯的物理数学模型。
2.
The paper researched the model and simulation of PWR nuclear power plant and found the basis for the research and simulation of "ADS".
本文研究了压水堆核电站系统的建模和仿真问题,初步完成了PWR核电站物理运行的PC机教学仿真演示平台系统,同时为“加速器驱动洁净核能系统”(ADS)的基础研究成果演示与仿真奠定基础。
6) nuclear plant
核电站
1.
This paper presents an experimental investigation and analyses to the cause of the air line explosion at a nuclear plant.
介绍了对美国一座核电站的控制系统空气管路爆炸事故的原因分析和实验研究。
2.
Ecological investigations were carried out in the waters around the planning nuclear plant located at Dongping, Yangjiang city, Guangdong province in April and October, 1998.
广东阳江东平核电站邻近海区生态调查于1998年4月(春季)和10月(秋季)进行。
补充资料:[3-(aminosulfonyl)-4-chloro-N-(2.3-dihydro-2-methyl-1H-indol-1-yl)benzamide]
分子式:C16H16ClN3O3S
分子量:365.5
CAS号:26807-65-8
性质:暂无
制备方法:暂无
用途:用于轻、中度原发性高血压。
分子量:365.5
CAS号:26807-65-8
性质:暂无
制备方法:暂无
用途:用于轻、中度原发性高血压。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条